
Pipework Installation Quiz
Authored by Glen Johnson
Construction
Vocational training
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a key consideration when planning the route for cold water pipework?
Avoid pipework near windows
Position pipework in visible areas for easy access
Avoid locations where frost and heat could cause problems
Pipework should always be buried in walls
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done before drilling into walls for pipework installation?
Ignore possible buried pipes or cables
Check for switches, sockets, and use a pipe detector
Drill without marking out the area
Only check for electrical wiring
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the maximum depth for a horizontal chase in a wall when concealing pipework?
1/4 of wall depth
1/6 of wall depth
1/3 of wall depth
1/8 of wall depth
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum horizontal distance required between cold water pipes and hot water/central heating pipes?
100 mm
200 mm
300 mm
400 mm
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the maximum depth allowed for a notch in a wooden joist for pipework installation?
1/6 of the joist depth
1/8 of the joist depth
1/4 of the joist depth
1/3 of the joist depth
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When laying pipes in walls or floors, what must be done to protect the pipe?
Lay pipes directly in contact with walls
Use thermal insulation and sleeves for protection
Embed pipes in the concrete floor
Do not use any protection
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of solder is prohibited in cold water systems?
Lead-free solder
Lead solder (70% lead + 30% tin)
Tin-copper solder
Acid-based flux
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
11 questions
UNIT 109 PPT 3 KNOWLEDGE CHECK AND STARTER.
Quiz
•
12th Grade - University
9 questions
Hot Water - PPT 2 - System Upgrades
Quiz
•
12th Grade
8 questions
Plumbing Materials: Radiator Valves True or False
Quiz
•
KG - University
13 questions
unit 109 joining pipe pp3
Quiz
•
KG - University
15 questions
Building Regulations in the UK
Quiz
•
12th Grade
15 questions
T-lvl 1 2-6 Structural Frame and Load Types Quiz
Quiz
•
11th Grade
12 questions
Careers in Construction Industry
Quiz
•
6th - 8th Grade
14 questions
Plumbing Materials: Understanding Radiator Components
Quiz
•
KG - University
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
54 questions
Analyzing Line Graphs & Tables
Quiz
•
4th Grade
22 questions
fractions
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
15 questions
Equivalent Fractions
Quiz
•
4th Grade