Search Header Logo

TE JANG Mech s3 u 8

English

University

TE JANG Mech s3 u 8
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What we are building to hold back flood wave?

Nuclear shelter

Embankments

Water level sensors

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How is electricity generated at the Three Gorges Dam?

by water turbines and generators

by wind turbines and solar panels

by using smaller vessels

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How was it possible to ship to 10.000 tonnes with vessels?

by constructing a ship lock

by divecting the river

by using smaller vessels

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

how long does it take to install pumps in a new marine terminal

one week

two week

three week

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

waht the marine terminal doesn't include?

tank farm

emergency pipeline

mooring line

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what does the generatog do?

Produces alterrating current

produces DC current

Consumes electricity power

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is it for drilling mud?

Cools the drill and removes rocks

Heats the drill forces the mus into the hole

Drilling mud does not occus in drilling

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?