Lean Manufacturing and Waste Reduction Quiz

Lean Manufacturing and Waste Reduction Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

Energy Sources

Energy Sources

10th Grade - University

20 Qs

Nuclear Lifecycle 7

Nuclear Lifecycle 7

University

10 Qs

Production, Planning, & Control Quiz

Production, Planning, & Control Quiz

University

20 Qs

CPE649: PRIMARY TREATMENT OF WASTEWATER

CPE649: PRIMARY TREATMENT OF WASTEWATER

University

15 Qs

Nuclear Lifecycle 9

Nuclear Lifecycle 9

University

10 Qs

Sustainable Practices in Civil Engineering

Sustainable Practices in Civil Engineering

University

20 Qs

GCSE Design and Technology: Production Techniques Quiz

GCSE Design and Technology: Production Techniques Quiz

10th Grade - University

15 Qs

Topic 3 - Sustainability & Green Technologies

Topic 3 - Sustainability & Green Technologies

University

16 Qs

Lean Manufacturing and Waste Reduction Quiz

Lean Manufacturing and Waste Reduction Quiz

Assessment

Quiz

Engineering

12th Grade

Easy

Created by

Andrew Harrison

Used 2+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the 'Sort' principle in 6S focus on?

Cleaning the workspace

Organising tools and materials

Removing unnecessary items

Standardising processes

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a key benefit of Single Minute Exchange of Die (SMED)?

Increased inventory levels

Reduced setup times

Higher defect rates

Increased downtime

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does KPI stand for in the context of business management?

Key Performance Indicator

Knowledge Process Integration

Key Product Innovation

Knowledge Performance Index

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the PDCA cycle, what does the 'D' stand for?

Develop

Design

Do

Deliver

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a principle of Lean Manufacturing?

Value Stream Mapping

Just-In-Time Production

Increasing Waste

Continuous Improvement

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a stage in the PDCA cycle?

Plan

Analyse

Integrate

Execute

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main focus of the 'Shine' principle in 6S?

Organising tools

Cleaning and maintaining the workspace

Standardising procedures

Reducing waste

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?