Search Header Logo

Agile Mastery Challenge

Authored by Nikhil govil

Computers

University

Agile Mastery Challenge
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of software requirements?

To determine the cost of the software

To define the functions and constraints of the software system

To design the software architecture

To ensure the system is implemented using the correct programming language

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In software requirements engineering, what does "elicitation" refer to?

Writing the requirements

Gathering requirements from stakeholders

Validating the software requirements

Implementing the requirements in the software

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following methods is best suited for modeling non-functional requirements such as performance and scalability?

Use case modeling

Goal-oriented requirements engineering (GORE)

State diagrams

Quality attribute scenarios

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In which phase of software development is the feasibility of software requirements typically evaluated?

Requirements engineering phase

Design phase

Post-deployment phase

Maintenance phase

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which SDLC model follows a linear sequential flow, where each phase must be completed before the next begins?

Waterfall model

Spiral model

Agile model

V-Model

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a key characteristic of the Agile model?

Flexibility to change requirements throughout the project

Flexibility to change requirements throughout the project

Phases are executed sequentially

High risk of failure for small projects

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a significant disadvantage of the Waterfall model?

It requires complex risk management

It lacks flexibility to accommodate changing requirements

It does not focus on testing

It is unsuitable for large-scale projects

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?