
Come on Over Rover (Mars rover fabrication)
Authored by Christine Mathers
Science
10th Grade
NGSS covered
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
OPEN ENDED QUESTION
5 mins • 4 pts
What 4 steps are required for a Mars rover after the rover is designed and before it is launched?
Evaluate responses using AI:
OFF
2.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Who is in charge of deciding what parts are made at NASA and what parts are made at other companies?
advanced manufacturing engineers
fabrications department
assembly workers
field testers
3.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
What is the title of the person who operates a vertical milling machine, a CNC machining center, or a lathe to make metal parts?
engineer
miller
machinist
assembly worker
4.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
How does the engineer best describe to a machinist the size of a part that needs to be made?
By making a model out of styrofoam to demonstrate
By using dimensions on a drawing
By taking a photo
By comparing the part to something the machinist already knows about
5.
OPEN ENDED QUESTION
3 mins • 1 pt
What is another word you could use for fabricate?
Evaluate responses using AI:
OFF
Tags
NGSS.MS-ETS1-4
6.
DRAG AND DROP QUESTION
2 mins • 2 pts
7.
CATEGORIZE QUESTION
5 mins • 3 pts
Which machines were used to manufacture parts for the Mars rovers?
Groups:
(a) Machines Used
,
(b) Machines NOT Used
horizontal milling machine
lathe
CNC machining center
vertical milling machine
AutoCAD fabricator
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?