CPP Quiz

CPP Quiz

Vocational training

18 Qs

quiz-placeholder

Similar activities

306 Hot water systems 3 Quiz

306 Hot water systems 3 Quiz

2nd Grade - University

18 Qs

Central heating-Plumbing revision quiz 3

Central heating-Plumbing revision quiz 3

KG - University

21 Qs

307 Central heating systems 1 Quiz

307 Central heating systems 1 Quiz

2nd Grade - University

20 Qs

Level 2 Cold Water Plumbing Exam [QUIZ 1]

Level 2 Cold Water Plumbing Exam [QUIZ 1]

12th Grade - University

20 Qs

PPT 13 - Testing and replacing components

PPT 13 - Testing and replacing components

12th Grade - University

21 Qs

unit 109 joining pipe pp3

unit 109 joining pipe pp3

KG - University

13 Qs

PPT 3 - Pipework & Circulation COL

PPT 3 - Pipework & Circulation COL

12th Grade - University

15 Qs

PPT 7 - Prepare for the installation of systems and components

PPT 7 - Prepare for the installation of systems and components

12th Grade

21 Qs

CPP Quiz

CPP Quiz

Assessment

Quiz

Construction

Vocational training

Hard

Created by

martin McDonald

Used 5+ times

FREE Resource

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When bending copper pipe by the spring bending method, the pipe is bent a little more than the angle required; the bend is then opened slightly to:

ensure that the pipe is bent to exactly the correct angle

prevent ‘ripples’ forming on the bend

prevent the pipe being ‘throated’

release the spring.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A plumber’s first action when receiving delivery of sanitary ware to a site should be to inspect that all items:

are free from damage/defects

meet the correct specification

are Water Regulation Advisory Scheme approved

include fixing instructions.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of screw would be used to fix a radiator bracket to a concrete block wall?

Steel counter-sunk

Self-tapping

Mirror screw

Chipboard screw

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Copper pipes are cleaned to:

allow the solder to adhere to pipe surfaces

permit them to be painted

enable the flux to adhere to the surface

prevent electrolytic corrosion.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

LCS tube can be jointed by:

capillary joints

solder ring joints

bronze welded joints

threaded joints.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the first action that should be carried out when commencing major installation work in a private dwelling?

Check the immediate work area for signs of damage to the décor

Lift the carpets and remove furniture in the work area, sheeting as necessary

Lift the floorboards and notch the joists in the required positions

Sheet the carpet and drill holes through external walls, as required

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to regulations, what is the maximum diameter of hole that can be drilled in a first floor joist that is 220mm deep in order to accept plastic pressure pipe?

25mm

30mm

45mm

55mm

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?