Con Built Environ PPT 6 Quiz

Con Built Environ PPT 6 Quiz

Vocational training

17 Qs

quiz-placeholder

Similar activities

First Fix Carpentry Quiz

First Fix Carpentry Quiz

12th Grade

15 Qs

305 Cold water systems 3 Quiz

305 Cold water systems 3 Quiz

2nd Grade - University

18 Qs

Orientation to Carpentry

Orientation to Carpentry

9th Grade

15 Qs

Year 1 Carpentry & Joinery

Year 1 Carpentry & Joinery

KG - University

17 Qs

Health and safety

Health and safety

KG

15 Qs

 Drainage - Soil Stack, Gullys, Manholes, Roddings

Drainage - Soil Stack, Gullys, Manholes, Roddings

11th Grade - University

14 Qs

C8 RADIOACTIVE

C8 RADIOACTIVE

1st - 5th Grade

20 Qs

Bpec Low Carbon Steel

Bpec Low Carbon Steel

KG - University

20 Qs

Con Built Environ PPT 6 Quiz

Con Built Environ PPT 6 Quiz

Assessment

Quiz

Construction

Vocational training

Practice Problem

Hard

Created by

Christopher Lockyer

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

17 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How can projects be categorised in the procurement process?

By color

By size

As domestic, commercial, or industrial

By cost

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What will determine how the needs and demands of the client are matched to the procurement route?

The project's budget

The project's timeline

The categorisation of the project

The project's location

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main focus of the session described in the document?

Designing buildings

Identifying different procurement routes

Hiring construction workers

Calculating project costs

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the significance of the procurement route in construction?

It determines the project's design

It influences the finalisation of contracts

It decides the project's location

It manages the construction team

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a closed (or selective) tender?

A tender open to all contractors

A tender where only invited contractors can submit a bid

A tender based on the lowest bid

A tender that requires public advertisement

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a closed tender?

To allow all contractors to bid

To select contractors with a good reputation

To find the cheapest contractor

To avoid any selection process

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who can participate in a closed tender?

Any contractor

Only those invited by the client

The first contractor to apply

The cheapest contractor

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?