Cold Water Mock Recap Exam 8202

Cold Water Mock Recap Exam 8202

Vocational training

28 Qs

quiz-placeholder

Similar activities

knowledge check 3

knowledge check 3

12th Grade

27 Qs

Understand the requirements of drainage systems

Understand the requirements of drainage systems

12th Grade

31 Qs

Central Heating Pictures Quiz

Central Heating Pictures Quiz

12th Grade - University

23 Qs

Bpec Key featuers of a domestic plumbing system

Bpec Key featuers of a domestic plumbing system

KG - University

25 Qs

PPT 11 - Testing and filling the central heating system

PPT 11 - Testing and filling the central heating system

12th Grade - University

25 Qs

Drainage Quiz 2

Drainage Quiz 2

12th Grade - University

24 Qs

System Components quiz

System Components quiz

12th Grade - University

26 Qs

Central Heating

Central Heating

KG - University

27 Qs

Cold Water Mock Recap Exam 8202

Cold Water Mock Recap Exam 8202

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Stuart Field

Used 6+ times

FREE Resource

28 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When installing a new indirect cold water system, which of the following should happen, according to the Water Regulations?

One tap, normally the kitchen sink, should be drawn directly from the supply pipe

One tap, normally the kitchen sink, should have a dedicated distribution pipe from the storage cistern

Mixer taps will require double check valves

Mixer taps should never be installed due to the pressure differences

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

According to BS6700 and the Water Regulations, a drain off valve should be installed:

At every draw off point

At every high point in the system

At every low point in the system

Above the cold water storage cistern

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Pin holing in copper pipework is commonly caused by:

Hard water

Acidic water

Alkaline water

Pure water

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

While installing pipework in a property, you are called off site to another job. What would be the correct course of action with any open-ended pipework?

Place a warning label on every open end

Cap off with a push fit fitting

Warn the customer not to interfere with any pipework

Be as quick as you can to return

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

One of the major problems when leaving a dead leg in a cold water pipe is:

Electrolytic corrosion

Pitting of pipework

Reduction in water flow

Possible bacterial growth

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The use of WRAS approved fittings when installing cold water pipework is:

A legal requirement

To be corrosion resistant

To avoid contamination

All of the above

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

On the completion of a new cold water installation, the system has been proven sound. What would the next course of action be?

Visual inspection with the customer

Flush the pipework out then hand over to the customer

Prepare the benchmark certificate

Hand over to the customer.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?