
Project Planning and Scheduling Quiz
Authored by Will Bynum
Mathematics
University
CCSS covered
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
44 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary tool for project planning?
Schedule
Contract
Plans and specs
Cost estimate
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The two types of schedules introduced in this chapter are?
Gantt charts and network diagrams
Linear schedule and bar charts
Bar charts and fast-tracked schedules
Network diagrams and continuous activity schedules
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Gantt charts are used to:
Show overall length of the project and each activity
Show relationships between activities
Show float
Describe the work breakdown structure
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is one type of network diagram?
Activity-on-node
Activity-on-date
Activity-on-dot
Activity-on-backward pass
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT a factor when determining what type of schedule to use?
Steel or concrete structure
Size of the company
Project size
Requirements in the plans and specs
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is NOT how schedules are used?
Conceptual schedules
Detailed schedules
Mini-schedules
Special-purpose schedules
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the typical period of time used in a short-interval schedule?
Three weeks
One day
Three months
One week
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Microsoft
or continue with
%20(1).png)
Apple
Others
Already have an account?