Search Header Logo

IPC Ch 3A

Authored by Corbyn Martin

Construction

12th Grade

Used 6+ times

IPC Ch 3A
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

01. A __________ is permitted to discharge to an approved nonpotable water system.

a. bidet
b. clothes washer
c. floor drain
d. sink

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

02. When there is a conflict between the requirements of the code and the manufacturer’s

a. code
b. more specific
c. more restrictive
d. manufacturer’s

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

03. A sump pump is permitted at the base of an elevator shaft when the discharge is

a. monitored by an alarm system
b. protected by a backflow device
c. directly connected to a storm drain
d. indirectly connected to the plumbing system

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

04. Materials required by the code to comply with a referenced standard must be listed by

a. evaluation service
b. third-party testing
c. third-party certification
d. accreditation service

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

05. The approved methods for preventing rodents from entering a structure do not

a. caulking
b. strainer plates
c. building traps
d. meter box design

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

06. The minimum burial depth of exterior water service piping is __________ inches

a. 6
b. 12
c. 24
d. 30

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

07. Where the frost line is established at 30 inches, water service pipe shall be installed a

a. 30
b. 32
c. 36
d. 42

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?