MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The title page lists all of the key entities involved in a project, such as the structural engineer, civil engineer, construction management firm, landscape architect, and mechanical engineer.
True
False
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The Foundation Plan shows both the underground work that needs to be completed at the beginning of the project for storm and sanitary sewer piping and surface paving work to be completed near the end of the project.
True
False
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The Grading and Utility Plan includes both the concrete foundation work and the structural steel information for the project.
True
False
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
All exterior wall and interior partition dimensions are given on the First Floor Plan.
True
False
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A different gridline system is used on the Second Floor Plan as the Foundation Plan and the First Floor Plan.
True
False
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Light fixtures to be installed around the outside of the building are shown with circles containing letters that relate to the electrical fixture schedule located on Specifications—Electrical, Sheet E-7.
True
False
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The roof pitch is 0.9” of rise for every 12” of horizontal run on the lower roof.
True
False
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?