Chapter 9 Veterinary Center

Chapter 9 Veterinary Center

12th Grade

10 Qs

quiz-placeholder

Similar activities

non profit organization

non profit organization

12th Grade

13 Qs

Introduction to Mil Quiz 1 - Shakespeare

Introduction to Mil Quiz 1 - Shakespeare

12th Grade

10 Qs

A Traditional Wedding

A Traditional Wedding

12th Grade

10 Qs

Construction Document Quiz

Construction Document Quiz

12th Grade

11 Qs

GROUP 1 QUIZ

GROUP 1 QUIZ

12th Grade

10 Qs

GRADE12 ASSESSMENT IN MODULE 6:RECREATIONAL ACTIVITIES (CAMPING)

GRADE12 ASSESSMENT IN MODULE 6:RECREATIONAL ACTIVITIES (CAMPING)

12th Grade

10 Qs

storytelling quiz part 3

storytelling quiz part 3

12th Grade

10 Qs

Family life

Family life

9th - 12th Grade

8 Qs

Chapter 9 Veterinary Center

Chapter 9 Veterinary Center

Assessment

Quiz

Others

12th Grade

Medium

Created by

JUAN SANTA ANA

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The title page lists all of the key entities involved in a project, such as the structural engineer, civil engineer, construction management firm, landscape architect, and mechanical engineer.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Foundation Plan shows both the underground work that needs to be completed at the beginning of the project for storm and sanitary sewer piping and surface paving work to be completed near the end of the project.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Grading and Utility Plan includes both the concrete foundation work and the structural steel information for the project.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All exterior wall and interior partition dimensions are given on the First Floor Plan.

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A different gridline system is used on the Second Floor Plan as the Foundation Plan and the First Floor Plan.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Light fixtures to be installed around the outside of the building are shown with circles containing letters that relate to the electrical fixture schedule located on Specifications—Electrical, Sheet E-7.

True

False

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The roof pitch is 0.9” of rise for every 12” of horizontal run on the lower roof.

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?