Building Up Rates Quiz: Reinforcement

Building Up Rates Quiz: Reinforcement

University

7 Qs

quiz-placeholder

Similar activities

HRC-503 Quiz

HRC-503 Quiz

University

11 Qs

7. Redes de Distribución

7. Redes de Distribución

University

11 Qs

Kuis Materi #11 Pengadaan Lahan

Kuis Materi #11 Pengadaan Lahan

University

10 Qs

Quiz sobre Ondas

Quiz sobre Ondas

University

10 Qs

ABC del Venado Eléctrico

ABC del Venado Eléctrico

University

10 Qs

CIVILWAR DAY 24 - KWA (ESTIMATION,FM)

CIVILWAR DAY 24 - KWA (ESTIMATION,FM)

1st Grade - University

10 Qs

soal MCB

soal MCB

11th Grade - University

10 Qs

Quiz Mekrek 1

Quiz Mekrek 1

University

10 Qs

Building Up Rates Quiz: Reinforcement

Building Up Rates Quiz: Reinforcement

Assessment

Quiz

Engineering

University

Easy

Created by

a'fifah khairunnisa zulkiflee

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the wastage percentage for cutting and damage in reinforcement work?

2%

5%

10%

15%

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the weight of a 10 mm diameter reinforcement bar per meter?

1.579 kg/m

0.888 kg/m

0.616 kg/m

0.395 kg/m

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many hours does it take for a blacksmith to cut and bend 1 tonne of 16 mm Ø reinforcement?

30 hours

25 hours

20 hours

15 hours

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the labor output for unloading and sorting output per tonne?

2 hours

1.50 hours

2.50 hours

1 hour

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the weight of a 25 mm diameter reinforcement bar per meter?

2.466 kg/m

3.854 kg/m

6.313 kg/m

9.864 kg/m

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the labor output for placing bars in a wall for 1 tonne of 16 mm Ø reinforcement?

30 hours

35 hours

50 hours

40 hours

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the wastage percentage for ready to use bars (cut and bend)?

5%

2%

15%

10%