Search Header Logo

HIRARC

Authored by Nur Afifah

Other

Professional Development

Used 1+ times

HIRARC
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is danger?

(Apa itu bahaya?)

Danger is hazard

(Bahaya itu hazard)

Likelihood X Severity

(Kebarangkalian X Keterukan)

Exposure to hazard

(Pendedahan kepada hazard)

Unsafe Act Unsafe Condition

(Kelakuan dan Keadaan yang tidak selamat)

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Based on the picture shown, what does this image indicates?

(Apakah maksud gambar yang ditunjukkan?)

Unsafe Act

(Kelakuan tidak selamat)

Unsafe Condition

(Keadaan tidak selamat)

Near miss

(Kemalangan nyaris)

Accident

(Kemalangan)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does HIRARC stand for?

(Apakah maksud HIRARC)

Hazard Identification, Reaction Assessment, and Risk Control

(Pengenalpastian Bahaya, Penilaian Reaksi, dan Kawalan Risiko)

Hazard Identification, Risk Assessment, and Risk Control

(Pengenalpastian Bahaya, Penilaian Risiko, dan Kawalan Risiko)

Hazard Involvement, Risk Analysis, and Risk Coordination

(Penglibatan Bahaya, Analisis Risiko, dan Penyelarasan Risiko)

Hazard Identification, Risk Assessment, and Resource Control

(Pengenalpastian Bahaya, Penilaian Risiko, dan Kawalan Sumber)

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a purpose of HIRARC?

(Yang manakah BUKAN tujuan HIRARC?)

To eliminate hazards in the workplace

(Untuk menghapuskan bahaya di tempat kerja)

To assess risks associated with workplace hazards

(Untuk menilai risiko yang berkaitan dengan bahaya di tempat kerja)

To implement controls to reduce risk

(Untuk melaksanakan kawalan bagi mengurangkan risiko)

To increase productivity without considering risks

(Untuk meningkatkan produktiviti tanpa mempertimbangkan risiko)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In risk control, which control measure is considered the most effective?

(Dalam kawalan risiko, langkah kawalan yang paling berkesan ialah...)

Personal Protective Equipment (PPE)

(Alat Pelindung Diri (PPE))

Engineering Control

(Kawalan Kejuruteraan)

Elimination of the hazard

(Penghapusan bahaya)

Administration Control

(Kawalan Pentadbiran)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is an example of an engineering control?

(Yang manakah merupakan contoh kawalan kejuruteraan?)

Using safety signs

(Menggunakan papan tanda keselamatan)

Installing guards on machinery

  • (Memasang penghadang pada mesin)

Training workers

(Melatih pekerja)

Implementing work procedures

(Melaksanakan prosedur kerja)

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After risk control measures are implemented, what is the next step in the HIRARC process?

(Selepas langkah kawalan risiko dilaksanakan, apakah langkah seterusnya dalam proses HIRARC?)

Reassessment of risk to ensure effectiveness

(Penilaian semula risiko untuk memastikan keberkesanan)

Removing all controls to reduce costs

(Menghapuskan semua kawalan untuk mengurangkan kos)

Ignoring new risks that arise

(Mengabaikan risiko baru yang timbul)

Initiating more training for hazards

(Memulakan lebih banyak latihan mengenai bahaya)

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?