6189 Plumbing and Water Systems Quiz

6189 Plumbing and Water Systems Quiz

1st Grade

20 Qs

quiz-placeholder

Similar activities

Temporary Benchmark (TBM) in Building Construction

Temporary Benchmark (TBM) in Building Construction

1st Grade

20 Qs

Manufacturing Masonry Units Quiz

Manufacturing Masonry Units Quiz

1st - 5th Grade

15 Qs

Water Conservation Quiz

Water Conservation Quiz

1st Grade

18 Qs

Scientific Principles Plumbing

Scientific Principles Plumbing

1st Grade

22 Qs

Plumbing System Quiz

Plumbing System Quiz

1st Grade

15 Qs

C8 RADIOACTIVE

C8 RADIOACTIVE

1st - 5th Grade

20 Qs

Rainwater Cycle Quiz

Rainwater Cycle Quiz

1st Grade

15 Qs

6189 Plumbing and Water Systems Quiz

6189 Plumbing and Water Systems Quiz

Assessment

Quiz

Construction

1st Grade

Hard

Created by

HARVEY BRADES

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which one of the following temperature ranges should hot water be stored?

30% – 35%

40% – 45%

50% – 55%

60% – 65%

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the minimum size of an open vent pipe from a hot water cylinder?

15 mm

22 mm

28 mm

35 mm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following component parts is installed after the incoming stop valve?

Drain off

Air vent

By-pass valve

Water meter

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the maximum depth a water main service should be laid?

750 mm

1000 mm

1350 mm

1650 mm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To ensure correct operation, a single feed indirect cylinder requires which one of the following to be formed?

A heat exchanger

An air bubble

An annulus

A flute

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is used by gravity primary pipework to circulate the water?

A circulating pump.

Conduction.

Radiation.

Convection.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the minimum distance the distribution pipe from the cylinder should be installed horizontally before it connects to the open vent pipe?

450 mm.

750 mm.

1350 mm.

1650 mm.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Construction