Electrical Cables Quiz

Electrical Cables Quiz

1st Grade

30 Qs

quiz-placeholder

Similar activities

PERMUTATIONS

PERMUTATIONS

1st Grade

25 Qs

Revision Write 0 to 20

Revision Write 0 to 20

1st Grade

30 Qs

I-std Cummulative exam 2

I-std Cummulative exam 2

1st Grade

25 Qs

Simple Maths Algebra

Simple Maths Algebra

1st - 10th Grade

25 Qs

LOCI IN TWO DIMENSIONS

LOCI IN TWO DIMENSIONS

1st - 3rd Grade

25 Qs

Mock quiz

Mock quiz

KG - 2nd Grade

25 Qs

Equations and Inequalities Review

Equations and Inequalities Review

KG - 7th Grade

31 Qs

QUIZ BEE

QUIZ BEE

1st Grade

25 Qs

Electrical Cables Quiz

Electrical Cables Quiz

Assessment

Quiz

Mathematics

1st Grade

Practice Problem

Easy

Created by

Abubakar Yusuf

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Full form of PILCSTA on cables

Paper insulated lead covered steel wire armoured

Plastic insulated lead covered steel wire armoured

Paper insulated lead covered steel tape armoured

Paper insulated laminated copper steel tape armoured

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3c 300 SAC XLPE 11KV on a cable record means

3 core 300sqmm Copper unsheathed 11KV

3 x 1 core 300sqmm Aluminium lead sheathed 11 KV

3 Core 300sqmm Solid Aluminium Conductor 11KV

3Core 300sqmm Stranded Copper Conductor 11KV

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is a circuit main earth applied to an overhead line?

After the issue of a safety document

Before the issue of a safety document

Before the line is isolated

After the additional earths have been applied

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Electrolytic action takes place:

Where dissimilar metal conductors are used

A reaction inside an overhead line transformer

The amount of current a conductor can hold

A low resistance joint

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum open ground clearance for an LV overhead line?

6.4m

5.2m

2.8m

4.2m

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are stockbridge dampers used on the overhead line steel towers?

To reduce damage due to lightening

To increase conductor strength

To increase insulator resistance

To reduce damage due to vibration

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When handling cold pour resins the mandatory PPE would be

Overalls and eye protection

Disposable gloves and breathing apparatus

Breathing apparatus and overall

Eye protection and disposable gloves

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?