Why is it important for engineers to identify failure points?

Engineering Design and Testing Principles

Interactive Video
•

Emma Peterson
•
Science, Engineering, Design
•
5th - 8th Grade
•
Hard
Read more
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To ensure the solution is aesthetically pleasing
To make the solution more expensive
To improve and refine the solution
To avoid any kind of testing
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step engineers take when testing a solution?
Avoid testing
Guess the outcome
Make a plan
Jump in randomly
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In the bowling alley example, what variable was isolated?
The weight of the ball
The color of the ball
The speed of the ball
The angle of the ball ramp
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the purpose of building a small model of the bridge?
To avoid building a real bridge
To identify failure points by testing weight capacity
To test the bridge's aesthetic design
To save money on materials
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the failure point identified in the bridge model test?
The bridge was too long
The bridge couldn't support the goal weight
The bridge was too expensive
The bridge was too short
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What additional factor caused the Tacoma Narrows Bridge to fail?
Earthquake
Flooding
Strong wind at a certain angle
Heavy traffic
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What lesson can be learned from the Tacoma Narrows Bridge example?
Bridges should be built in windy areas
Multiple variables should be tested for failure points
Bridges should be built quickly
Only weight capacity matters in bridge design
8.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the final step in the engineering process to ensure a solution is successful?
Ignore failure points
Build without a plan
Isolate and test variables
Avoid testing
9.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is planning to fail considered beneficial in engineering?
It makes the solution more expensive
It saves time
It avoids the need for testing
It helps improve the solution
10.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a key component of the plan engineers make to test solutions?
Ignoring variables
Isolating a variable and conducting trials
Avoiding any changes
Testing all variables at once
Explore all questions with a free account
Similar Resources on Quizizz
11 questions
Hydraulic Bridge Construction Concepts

Interactive video
•
6th - 8th Grade
11 questions
Popsicle Stick Bridge Challenge

Interactive video
•
6th - 8th Grade
6 questions
Bowled Over

Interactive video
•
4th - 9th Grade
11 questions
Engineering Problem Solving Techniques

Interactive video
•
5th - 8th Grade
11 questions
Engineering Failure Points and Solutions

Interactive video
•
5th - 8th Grade
11 questions
Engineering Testing and Failure Analysis

Interactive video
•
5th - 8th Grade
6 questions
Fixing Failure Points

Interactive video
•
4th - 9th Grade
6 questions
Fixing Failure Points

Interactive video
•
4th - 9th Grade
Popular Resources on Quizizz
17 questions
CAASPP Math Practice 3rd

Quiz
•
3rd Grade
20 questions
math review

Quiz
•
4th Grade
21 questions
6th Grade Math CAASPP Practice

Quiz
•
6th Grade
13 questions
Cinco de mayo

Interactive video
•
6th - 8th Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
10 questions
4th Grade Math CAASPP (part 1)

Quiz
•
4th Grade
45 questions
5th Grade CAASPP Math Review

Quiz
•
5th Grade
Discover more resources for Science
40 questions
Science FAST Review

Quiz
•
5th Grade
46 questions
5th Grade Science Review

Quiz
•
5th Grade
18 questions
Science EOG Review

Quiz
•
5th Grade
10 questions
WCPSS Science Jam Practice

Quiz
•
5th Grade
39 questions
VA Science SOL review 4.4 4.5 4.6 4.7 4.8

Quiz
•
5th Grade
20 questions
Earth Science Review

Quiz
•
5th Grade
25 questions
5th Grade NC Science EOG Review Part 1

Quiz
•
5th Grade
20 questions
Evolution and Natural Selection

Quiz
•
7th Grade