Engineering Design and Testing Principles

Engineering Design and Testing Principles

Assessment

Interactive Video

Created by

Emma Peterson

Science, Engineering, Design

5th - 8th Grade

Hard

The video explains the importance of identifying and fixing failure points in engineering solutions. It discusses how engineers plan and test solutions by isolating variables and conducting trials. The video uses examples like a bowling alley and a bridge model to illustrate the process of finding failure points. It emphasizes the need to improve designs and test for various failure points to ensure safety and success.

Read more

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important for engineers to identify failure points?

To ensure the solution is aesthetically pleasing

To make the solution more expensive

To improve and refine the solution

To avoid any kind of testing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step engineers take when testing a solution?

Avoid testing

Guess the outcome

Make a plan

Jump in randomly

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the bowling alley example, what variable was isolated?

The weight of the ball

The color of the ball

The speed of the ball

The angle of the ball ramp

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the purpose of building a small model of the bridge?

To avoid building a real bridge

To identify failure points by testing weight capacity

To test the bridge's aesthetic design

To save money on materials

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the failure point identified in the bridge model test?

The bridge was too long

The bridge couldn't support the goal weight

The bridge was too expensive

The bridge was too short

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What additional factor caused the Tacoma Narrows Bridge to fail?

Earthquake

Flooding

Strong wind at a certain angle

Heavy traffic

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What lesson can be learned from the Tacoma Narrows Bridge example?

Bridges should be built in windy areas

Multiple variables should be tested for failure points

Bridges should be built quickly

Only weight capacity matters in bridge design

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the engineering process to ensure a solution is successful?

Ignore failure points

Build without a plan

Isolate and test variables

Avoid testing

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is planning to fail considered beneficial in engineering?

It makes the solution more expensive

It saves time

It avoids the need for testing

It helps improve the solution

10.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key component of the plan engineers make to test solutions?

Ignoring variables

Isolating a variable and conducting trials

Avoiding any changes

Testing all variables at once

Explore all questions with a free account

or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?