The video discusses Bertha, Seattle's tunnel boring machine, detailing its repair and operation. It explains how Bertha functions like a giant inchworm, using a rotating head to chew through rock and a conveyor belt to remove debris. The construction process involves laying concrete segments to form the tunnel wall. Safety challenges, such as working under hyperbaric pressure, are highlighted. The project promises to transform Seattle's waterfront, boosting real estate and benefiting the economy and environment.

Read more

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of Bertha, the tunnel boring machine?

To construct bridges

To pave roads

To dig tunnels

To build skyscrapers

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does the tunnel boring machine move forward?

By using wheels

By floating on water

By hydraulic thrusters

By being pushed manually

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens to the material excavated by the tunnel boring machine?

It is used to build houses

It is thrown away

It is transported to the back of the machine

It is left inside the tunnel

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What forms the circular wall of the new tunnel?

Metal sheets

Plastic panels

Wooden planks

Concrete arc segments

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who are the workers inside the tunnel called?

Engineers

Miners

Sandhogs

Tunnelers

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a significant risk for workers due to the hyperbaric conditions?

Dehydration

The bends

Frostbite

Heat stroke

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is most of the tunneling work done by the machine?

It is faster

It is safer

It is cheaper

It is more accurate

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the expected benefits of the tunnel project for Seattle?

Decreased property values

Higher pollution levels

Improved waterfront access

Increased traffic congestion

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How will the tunnel project impact Seattle's economy?

It will cause a recession

It will benefit the economy

It will harm the economy

It will have no impact

10.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What environmental benefit is expected from the tunnel project?

Higher noise levels

Improved environmental conditions

Reduced green spaces

Increased air pollution

Explore all questions with a free account

or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?