

Tunnel Construction and Impact Assessment
Interactive Video
•
Science, Geography, Engineering, Architecture
•
9th - 12th Grade
•
Practice Problem
•
Medium
Olivia Brooks
Used 1+ times
FREE Resource
Read more
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary purpose of Bertha, the tunnel boring machine?
To construct bridges
To pave roads
To dig tunnels
To build skyscrapers
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How does the tunnel boring machine move forward?
By using wheels
By floating on water
By hydraulic thrusters
By being pushed manually
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What happens to the material excavated by the tunnel boring machine?
It is used to build houses
It is thrown away
It is transported to the back of the machine
It is left inside the tunnel
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What forms the circular wall of the new tunnel?
Metal sheets
Plastic panels
Wooden planks
Concrete arc segments
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who are the workers inside the tunnel called?
Engineers
Miners
Sandhogs
Tunnelers
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a significant risk for workers due to the hyperbaric conditions?
Dehydration
The bends
Frostbite
Heat stroke
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is most of the tunneling work done by the machine?
It is faster
It is safer
It is cheaper
It is more accurate
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?