Carpentry EOPA Part 1 (Revised)

Carpentry EOPA Part 1 (Revised)

9th - 12th Grade

50 Qs

quiz-placeholder

Similar activities

Unit 103: Environmental and sustainability ppt 4

Unit 103: Environmental and sustainability ppt 4

10th Grade

46 Qs

Copper Pipe Fitting Quiz

Copper Pipe Fitting Quiz

12th Grade

51 Qs

Construction Quiz #2

Construction Quiz #2

12th Grade

50 Qs

Plumbing Processes PPT 1 - Hand Tools

Plumbing Processes PPT 1 - Hand Tools

12th Grade - University

49 Qs

unit 103 powerpoint 2 Energy Use in Dwellings Quiz

unit 103 powerpoint 2 Energy Use in Dwellings Quiz

10th Grade

45 Qs

IKORCC Carpentry Level 1

IKORCC Carpentry Level 1

12th Grade

50 Qs

R.W Vocab Exam: Ch.1&2

R.W Vocab Exam: Ch.1&2

9th - 12th Grade

45 Qs

Sustainability Quiz

Sustainability Quiz

12th Grade

50 Qs

Carpentry EOPA Part 1 (Revised)

Carpentry EOPA Part 1 (Revised)

Assessment

Quiz

Construction

9th - 12th Grade

Medium

Created by

Jacci Robinson

Used 33+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Which answer option BEST describes why it is important to follow guidelines when installing trim on doors?

To reduce project costs

To comply with codes and warranties

To create eye appeal within the project

To best math industry trends

2.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Which type of molding is commonly used to cover the joint between the wall surface and the floor?

Baseboards

Crown molding

Chair rail

Casing

3.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Which of the following options is not a SIZE that 4 x 8 Oriented Strand Board (OSB) can be delivered as?

48 x 96" and 47 7/8" x 95 7/8"

48" x 96" and 96" x 48"

47 1/4" x 95 1/4"

4' x 8'

4.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

On the site plan, what does the abbreviation "CL" usually represent?

Centerline

Construction Limit

Critical Level

Curb Length

5.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What is the actual size of 2 x 8 nominal lumber

1 3/8 x 7 1/2

2 x 8

1 1/2 x 7 1/4

1 1/2 x 7 1/2

6.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

A double top plate should be offset from the top plate by how many inches in residential construction?

16"

24"

32"

48"

7.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Plans call for 12" pilaster, in the corners and at third points around the perimeter of the foundation of the structure measuring 64' x 46'. What are the measurements centerline to centerline between the the pilasters on the short and long sides?

15' & 21'

14' & 20"

15'4" & 21'4"

14'4" & 20'

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?