Carpentry EOPA Part 3

Carpentry EOPA Part 3

9th - 12th Grade

19 Qs

quiz-placeholder

Similar activities

First Fix Carpentry Quiz

First Fix Carpentry Quiz

12th Grade

15 Qs

MT Environmental Learner Outcome 5

MT Environmental Learner Outcome 5

11th Grade

19 Qs

305 Cold water systems 3 Quiz

305 Cold water systems 3 Quiz

2nd Grade - University

18 Qs

Orientation to Carpentry

Orientation to Carpentry

9th Grade

15 Qs

 Drainage - Soil Stack, Gullys, Manholes, Roddings

Drainage - Soil Stack, Gullys, Manholes, Roddings

11th Grade - University

14 Qs

SCROLL SAW QUIZ

SCROLL SAW QUIZ

9th Grade

16 Qs

Basic Electrical Construction Documents (Electrical L1) Quiz

Basic Electrical Construction Documents (Electrical L1) Quiz

12th Grade

20 Qs

Initial assessment 301 part 2

Initial assessment 301 part 2

12th Grade

19 Qs

Carpentry EOPA Part 3

Carpentry EOPA Part 3

Assessment

Quiz

Construction

9th - 12th Grade

Practice Problem

Medium

Created by

Jacci Robinson

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

19 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

When constructing a built-in, where can one find specified sizes, shapes and finishes?

Builders can use personal judgment for these elements, so they are not specified anywhere 

Written on the drywall for where the built-in will be placed 

Project blueprints or plans 

Owners decide these elements, SO the builder should leave them unfinished 

2.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Why is it important to adhere to industry standards during the installation of wood shingles and miter corners? 

To increase project costs. 

To ignore safety precautions. 

To ensure Structural integrity. 

To speed up the process. 

3.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What should always be included with an engineered lumber delivery? 

Correct nails, hangers and engineered lumber saw blades 

Engineering data and application drawing for the materials 

Composite shims, post bases and hangers 

Positive Placement Fasteners, Hangers and LVL Flat Lock Screws 

4.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

In a finish schedule, what does the abbreviation “SQFT” stand for?

Surface Quality for Finishing Techniques 

Square Footage 

Structural Quality for Flooring Treatments 

Standard Quantity for Finishing Tasks 

5.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

How accurate would a 300’ water level be over a 225’ span? 

Plus/minus 1/16” 

Plus/minus 1/8” 

Plus/minus 0”. 

Plus/minus ¼” 

6.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Blueprints for closets should always specify which of the following? 

Location and finish 

Location only 

Size location and finish 

Size only

7.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

In construction terminology, what does the acronym “ROW” stand for? 

Right-of-Way 

Reclaimed Wood 

Residential Overlay Zone 

Record of Work 

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?