1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first stage of a typical construction project?
Tendering
Construction
Design
Maintenance
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who creates the working drawings based on the client’s requirements?
Quantity Surveyor
Architect
Clerk of Works
Estimator
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does an estimator do during the tendering process?
Supervises construction work
Inspects the quality of the work
Calculates the project's total cost
Creates the building design
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In a fixed-price contract, who covers increased costs after the contract is signed?
Client
Contractor
Estimator
Subcontractor
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What document lists all the parts needed to build a product?
Specification
Take-off sheet
Drawing
Bill of Materials
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which role is responsible for inspecting and checking work on-site?
Clerk of Works
Contracts Manager
Estimator
Project Manager
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of these is part of the electrical project stages?
Planning
Design
Evaluation
Inspection
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?