g11- Planning and Installing Systems Quiz

g11- Planning and Installing Systems Quiz

11th Grade

9 Qs

quiz-placeholder

Similar activities

học Quản Trị Tri Thức chưa người đẹp??

học Quản Trị Tri Thức chưa người đẹp??

University

10 Qs

Multiple Choice Quiz: Designing for Impact

Multiple Choice Quiz: Designing for Impact

University

10 Qs

Starter Understanding Software Testing Concepts

Starter Understanding Software Testing Concepts

12th Grade

10 Qs

User Research (Binus University)

User Research (Binus University)

University

12 Qs

Maintaining and Repairing Computer Systems and Networks

Maintaining and Repairing Computer Systems and Networks

12th Grade

10 Qs

Ethical Hacking week #1

Ethical Hacking week #1

University

10 Qs

Quiz-Virtualization

Quiz-Virtualization

University

14 Qs

CC105 - Quiz No. 3

CC105 - Quiz No. 3

University

10 Qs

g11- Planning and Installing Systems Quiz

g11- Planning and Installing Systems Quiz

Assessment

Quiz

Information Technology (IT)

11th Grade

Easy

Created by

Sherin Kamel

Used 2+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What are the four alternatives that could ease the process of implementing/installing a new system?

Direct changeover

Parallel running

Pilot running

Phased conversion

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the advantage of direct changeover?

Minimal time and effort, new system is available immediately

If the new system fails, the old systems runs a backup

All features are fully trialled

Allows people to get used to the new system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a disadvantage of parallel running?

Running two systems is costly in terms of time and money

If the new system fails, there is no fall back

Only a small part of the organisation suffers

Training of staff can be done in stages

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the method of pilot running?

The new system is stopped and new system is started

The new system is started, but the old system is kept running alongside it

The new system is piloted with a small subset of the organisation

The new system is introduced in phases

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a disadvantage of phased conversion?

If the new system fails, there is no fall back for that part of the system

Running two systems is costly in terms of time and money

Only part of the data will be at the destination

The rules that are set up by programmers can be different

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What can cause problems in data migration?

Incompatible file formats

Incomplete data transfers

Validation rules

All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the importance of testing in a computerized system?

It ensures that the system works as expected

It reduces productivity

It increases end user dissatisfaction

It is not important

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the difference between alpha and beta testing?

Alpha testing is performed by internal employees, beta testing by clients

Alpha testing is performed at client location, beta testing at developer's site

Alpha testing is less important than beta testing

There is no difference

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does black-box testing treat software as?

A black-box without knowing its internals

A white-box with full knowledge of its internals

A system that is not tested

An outdated software