Cavity wall ties

Cavity wall ties

9th Grade

14 Qs

quiz-placeholder

Similar activities

Quiz on Construction Methods

Quiz on Construction Methods

9th Grade

15 Qs

Hierarchy of controls + Fire Safety

Hierarchy of controls + Fire Safety

9th - 12th Grade

10 Qs

Describe the typical components of buildings and structures

Describe the typical components of buildings and structures

9th Grade

11 Qs

Sling and Hoist Quiz

Sling and Hoist Quiz

9th Grade

15 Qs

26205 Electrical Conduit and Fittings Quiz

26205 Electrical Conduit and Fittings Quiz

9th Grade

15 Qs

Cavity wall ties

Cavity wall ties

Assessment

Quiz

Construction

9th Grade

Hard

Created by

Edward Evans

Used 2+ times

FREE Resource

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In standard brick-to-block construction, wall ties are built into the leaves during construction. To ensure wall ties are effective at tying the leaves together they should be pressed down in and then surrounded by fresh mortar and should never be pushed into a pre-built joint. They should be installed with a slight fall to the ------- leaf, not towards the ------- leaf

Outer then inner

inner then outer

left then right

right then left

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The minimum density of cavity wall ties (as defined in Eurocode 6) is 2.5 ties per square metre. Typically they are installed at what measurement horizontal and what measurement vertical spacing

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Blockwork coursing usually means wall ties are installed at what vertical spacing on reveals

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Are you supposed to lay wall ties directly above each other or are you supposed to lay in a staggered pattern

Above each other

Staggered

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

There are 4 types of wall tie to tie masonry to masonry and 3 types of tie to tie masonry to timber. Which type of wall tie is used on domestic traditional masonry to masonry (relatively tall or unusually shaped buildings in vulnerable areas where wind speeds exceed 31 m/s usually)

Type 1 / ST1, SD1,

type 2

type 3

type 4

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

When laying wall ties on Masonry to masonry cavity walling what is the maximum distance inbetween wall ties horizontally?

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When laying wall ties around an opening on masonry to masonry cavity walls what is the maximum distance away from a reveal a wall tie should be placed

225mm

300mm

150mm

400mm

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?