EIM Q2 Review

EIM Q2 Review

12th Grade

25 Qs

quiz-placeholder

Similar activities

PROGRAMAS DE WINDOWS Y SUS FUNCIONES

PROGRAMAS DE WINDOWS Y SUS FUNCIONES

12th Grade

20 Qs

Intro to CyberSecurity - Intro to Networking

Intro to CyberSecurity - Intro to Networking

9th - 12th Grade

25 Qs

Automobile engine 2nd

Automobile engine 2nd

12th Grade

21 Qs

CS1_Wk18_Troubleshooting

CS1_Wk18_Troubleshooting

9th - 12th Grade

20 Qs

PTS XII B.INGGRIS

PTS XII B.INGGRIS

12th Grade

20 Qs

Onsite Guide quiz Rafi,Reece,Yousha,Tanveer

Onsite Guide quiz Rafi,Reece,Yousha,Tanveer

12th Grade

23 Qs

INSTALA Y CONFIGURA APLICACIONES Y SERVICIOS PARCIAL 2

INSTALA Y CONFIGURA APLICACIONES Y SERVICIOS PARCIAL 2

12th Grade

25 Qs

MTA Networking Fundamentals Review Part 3

MTA Networking Fundamentals Review Part 3

9th - 12th Grade

23 Qs

EIM Q2 Review

EIM Q2 Review

Assessment

Quiz

Instructional Technology

12th Grade

Hard

Created by

Edgar Burgos

Used 1+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary reason for installing pull boxes in conduit runs?

A. To connect conduits of different diameters

B. To make it easier to pull wires through the conduits

C. To protect the conduits from damage

D. To reduce the length of the conduit

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What tool is most commonly used to ensure that conduits are properly aligned along walls and ceilings?

A. Cable puller

B. Level

C. Multimeter

D. Pipe cutter

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to standard electrical codes, what is the maximum number of 90-degree bends allowed in a single conduit run without a pull box?

A. One

B. Two

C. Three

D. Four

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of the service disconnect switch?

A. To isolate the entire electrical system for maintenance or emergencies

B. To monitor the electricity usage

C. To prevent power surges

D. To regulate the current entering the house

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which component must be installed outside the house for the utility company to measure electricity usage?

A. Grounding electrode

B. Main breaker panel

C. Meter base

D. Service disconnect switch

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of grounding in a service entrance installation?

A. To give excess electrical charges a safe place to go

B. To prevent corrosion of the wires

C. To secure the conduits in place

D. To support the weight of the conductors

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following must be considered when running service entrance conductors?

A. Ensuring proper clearances from windows and doors

B. Running wires directly on the ground without conduits

C. Selecting the wire color to match the house exterior

D. Using uninsulated wires for easier installation

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Instructional Technology