MMC H&S, Regulations, Prefabrication

MMC H&S, Regulations, Prefabrication

University

9 Qs

quiz-placeholder

Similar activities

Plumbing Systems Decommissioning Quiz

Plumbing Systems Decommissioning Quiz

12th Grade - University

13 Qs

Penilaian Risiko K3

Penilaian Risiko K3

University

10 Qs

Governing Law Quiz

Governing Law Quiz

University

14 Qs

SHU Seminar Quiz 11.11.2024

SHU Seminar Quiz 11.11.2024

University

14 Qs

Division 10+ Review

Division 10+ Review

University

13 Qs

Risk, Documents, Specifications, EIA

Risk, Documents, Specifications, EIA

University

10 Qs

Quiz on BedZED: Pioneering Sustainable Community Living

Quiz on BedZED: Pioneering Sustainable Community Living

University

9 Qs

Kuis Dasar K2 2025

Kuis Dasar K2 2025

University

10 Qs

MMC H&S, Regulations, Prefabrication

MMC H&S, Regulations, Prefabrication

Assessment

Quiz

Construction

University

Easy

Created by

Emma Coyle

Used 1+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following is a statutory duty under Ireland’s Building Control Regulations?

Signing a Commencement Notice

Preparing tender documents

Drafting architectural designs

Supervising contractors daily

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What does a Preliminary Safety and Health Plan include?

Project marketing strategies

Safety risks identified during the design phase

Financial expenditure records

Equipment procurement lists

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary purpose of RAMS (Risk Assessment and Method Statement)?

Designer's to meet their statutory obligations

Managing subcontractor schedules

Designing architectural layouts

Detailing construction methodologies for safety

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is prefabrication primarily aimed at reducing?

Complexity in design phases

Labour hours spent on site

Financial auditing costs

Urban traffic congestion

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is a significant disadvantage of prefabrication?

Dependency on weather conditions

High risk of worker safety incidents

High risk of worker safety incidents

Requirement for early decision-making

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What does a "critical path" in project scheduling represent?

The longest sequence of tasks without delays

A list of the Project Manager's most important tasks

A task sequence with the highest costs

The shortest timeline for material delivery

7.

FILL IN THE BLANK QUESTION

1 min • 3 pts

ICF stands for Insulated ____ Formwork

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a primary benefit of using SIPs over traditional building methods?

No need for external cladding

Unlimited design flexibility

Faster and more predictable construction processes

Reduced reinforcement requirements

9.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

How are the layers in CLT)panels oriented?

All layers aligned in the same direction

Each layer perpendicular to the previous one

Alternating layers set at a 45-degree angle

Randomly aligned for flexibility