Construction info & data Quiz PPT 3

Construction info & data Quiz PPT 3

12th Grade

15 Qs

quiz-placeholder

Similar activities

MTL1 H&S Learner Outcome 1

MTL1 H&S Learner Outcome 1

11th Grade - University

13 Qs

First Fix Carpentry Quiz

First Fix Carpentry Quiz

12th Grade

15 Qs

rigging w1

rigging w1

12th Grade

10 Qs

305 Cold water systems 3 Quiz

305 Cold water systems 3 Quiz

2nd Grade - University

18 Qs

 Drainage - Soil Stack, Gullys, Manholes, Roddings

Drainage - Soil Stack, Gullys, Manholes, Roddings

11th Grade - University

14 Qs

Basic Electrical Construction Documents (Electrical L1) Quiz

Basic Electrical Construction Documents (Electrical L1) Quiz

12th Grade

20 Qs

Initial assessment 301 part 2

Initial assessment 301 part 2

12th Grade

19 Qs

MTL2 Hot Water Learner Outcome 8

MTL2 Hot Water Learner Outcome 8

12th Grade

15 Qs

Construction info & data Quiz PPT 3

Construction info & data Quiz PPT 3

Assessment

Quiz

Construction

12th Grade

Practice Problem

Medium

Created by

Simon Mcphee

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common feature of both work order management systems and CMMS?

They both focus on sales

They both use dashboards

They both create new software

They both manage human resources

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should a full redesign of the replacement system ensure?

It is cheaper than the original

It meets current British Standards

It uses outdated technology

It is smaller in size

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which factor is NOT mentioned as a reason for system replacement?

Non-availability of spare parts

Building grants

Increase in building height

Investment in buildings

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be considered during the redesign of a replacement system?

The color of the building

Existing data collected on the building

The number of windows

The type of flooring

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When are building services engineering systems truly tested against client expectations?

During the design phase

After handover and in operation

Before construction begins

During the initial planning stage

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important that buildings are not handed over in a poor state of operational readiness?

It increases construction costs

It can lead to legal disputes

It can be a risk due to programme delays

It affects the building's aesthetic appeal

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main goal of establishing a baseline in POE?

To make comparisons after project completion

To design the building

To calculate costs

To hire contractors

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?