Construction info & data Quiz PPT 3

Construction info & data Quiz PPT 3

12th Grade

15 Qs

quiz-placeholder

Similar activities

202 Revision Extra questions

202 Revision Extra questions

12th Grade

20 Qs

Construction Drawing Quiz 102 A

Construction Drawing Quiz 102 A

12th Grade

20 Qs

306 hot water systems 2 Quiz

306 hot water systems 2 Quiz

2nd Grade - University

20 Qs

unit 101 ppt 1 knowledge check

unit 101 ppt 1 knowledge check

12th Grade - University

17 Qs

Building Information Modelling (BIM) Quiz T Level

Building Information Modelling (BIM) Quiz T Level

12th Grade

15 Qs

Maintenance 210

Maintenance 210

12th Grade - University

16 Qs

PPT 11 - Decommission systems and components

PPT 11 - Decommission systems and components

12th Grade

11 Qs

Understanding Health and Safety Regulations

Understanding Health and Safety Regulations

12th Grade

16 Qs

Construction info & data Quiz PPT 3

Construction info & data Quiz PPT 3

Assessment

Quiz

Construction

12th Grade

Medium

Created by

Simon Mcphee

Used 2+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common feature of both work order management systems and CMMS?

They both focus on sales

They both use dashboards

They both create new software

They both manage human resources

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should a full redesign of the replacement system ensure?

It is cheaper than the original

It meets current British Standards

It uses outdated technology

It is smaller in size

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which factor is NOT mentioned as a reason for system replacement?

Non-availability of spare parts

Building grants

Increase in building height

Investment in buildings

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be considered during the redesign of a replacement system?

The color of the building

Existing data collected on the building

The number of windows

The type of flooring

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When are building services engineering systems truly tested against client expectations?

During the design phase

After handover and in operation

Before construction begins

During the initial planning stage

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important that buildings are not handed over in a poor state of operational readiness?

It increases construction costs

It can lead to legal disputes

It can be a risk due to programme delays

It affects the building's aesthetic appeal

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main goal of establishing a baseline in POE?

To make comparisons after project completion

To design the building

To calculate costs

To hire contractors

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?