Unit 104 first fix Installation Quiz

Unit 104 first fix Installation Quiz

11th Grade

15 Qs

quiz-placeholder

Similar activities

Electrical Technology NCCER (11th Edition) Module 1 Review

Electrical Technology NCCER (11th Edition) Module 1 Review

9th - 12th Grade

10 Qs

303 Scientific Principles Quiz

303 Scientific Principles Quiz

2nd Grade - University

20 Qs

Multi-skills induction

Multi-skills induction

11th Grade

10 Qs

Resistor Color Code Quiz

Resistor Color Code Quiz

9th - 12th Grade

20 Qs

The Goal – End of Book Quiz

The Goal – End of Book Quiz

9th - 12th Grade

10 Qs

Build Your Future in Construction Module 00100

Build Your Future in Construction Module 00100

11th Grade

20 Qs

1 - General Shop / Tool Safety 2024

1 - General Shop / Tool Safety 2024

9th - 12th Grade

15 Qs

Hierarchy of controls + Fire Safety

Hierarchy of controls + Fire Safety

9th - 12th Grade

10 Qs

Unit 104 first fix Installation Quiz

Unit 104 first fix Installation Quiz

Assessment

Quiz

Construction

11th Grade

Hard

Created by

Nigel Pawlett

Used 1+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the first fix in construction?

To complete the exterior design

To prepare the building for plastering

To finalize the interior decoration

To install furniture

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is included in the first fix regarding water supply?

Installing pillar taps

Laying pipes for water supply

Setting up water heaters

Connecting to the main water line

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is typically done during the first fix stage of construction?

Painting walls

Installing kitchen cabinets

Running electrical cables

Fitting bathroom tiles

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main objective of the first fix stage in building construction?

To complete the roofing

To set up the building's structural framework

To paint the walls

To install lighting fixtures

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is done with the ends of pipes during the "First fix"?

They are painted.

They are capped off.

They are left open.

They are connected to appliances.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT part of the "First fix" in plumbing?

Installation of pipes.

Installation of cables.

Painting the walls.

Capping off pipe ends.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of capping off the tail ends of pipes?

To prevent leaks.

To enhance appearance.

To connect to appliances.

To extend the pipes.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?