Unit 104 first fix Installation Quiz

Unit 104 first fix Installation Quiz

11th Grade

15 Qs

quiz-placeholder

Similar activities

Basic Hand Tools Quiz

Basic Hand Tools Quiz

9th - 12th Grade

10 Qs

OSHA & Production Safety Quiz

OSHA & Production Safety Quiz

9th - 12th Grade

15 Qs

Młodociany co wolno co nie wolno :)

Młodociany co wolno co nie wolno :)

1st Grade - University

10 Qs

Week 9 Production Review Quiz

Week 9 Production Review Quiz

9th - 12th Grade

18 Qs

Video: Instalación de cámaras de seguridad CCTV con NVR PoE

Video: Instalación de cámaras de seguridad CCTV con NVR PoE

11th Grade - University

11 Qs

Stairs Construction

Stairs Construction

9th - 12th Grade

14 Qs

Greywater & McHP

Greywater & McHP

2nd Grade - University

15 Qs

 Drainage - Pipe materials and falls

Drainage - Pipe materials and falls

11th Grade - University

10 Qs

Unit 104 first fix Installation Quiz

Unit 104 first fix Installation Quiz

Assessment

Quiz

Construction

11th Grade

Hard

Created by

Nigel Pawlett

Used 1+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the first fix in construction?

To complete the exterior design

To prepare the building for plastering

To finalize the interior decoration

To install furniture

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is included in the first fix regarding water supply?

Installing pillar taps

Laying pipes for water supply

Setting up water heaters

Connecting to the main water line

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is typically done during the first fix stage of construction?

Painting walls

Installing kitchen cabinets

Running electrical cables

Fitting bathroom tiles

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main objective of the first fix stage in building construction?

To complete the roofing

To set up the building's structural framework

To paint the walls

To install lighting fixtures

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is done with the ends of pipes during the "First fix"?

They are painted.

They are capped off.

They are left open.

They are connected to appliances.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT part of the "First fix" in plumbing?

Installation of pipes.

Installation of cables.

Painting the walls.

Capping off pipe ends.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of capping off the tail ends of pipes?

To prevent leaks.

To enhance appearance.

To connect to appliances.

To extend the pipes.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?