Pre-ISA test

Pre-ISA test

Assessment

Quiz

Construction

Vocational training

Practice Problem

Hard

Created by

Luke Rock

FREE Resource

Student preview

quiz-placeholder

20 questions

Show all answers

1.

OPEN ENDED QUESTION

3 mins • 1 pt

Describe the checks you would carry out before tightness testing a gas system.

Evaluate responses using AI:

OFF

2.

OPEN ENDED QUESTION

3 mins • 1 pt

What is the minimum purge volume for a gas system connected to a metric meter?

Evaluate responses using AI:

OFF

3.

OPEN ENDED QUESTION

3 mins • 1 pt

You arrive at a job and suspect the system may be too large for you to work on.  What is the max system volume you are able to allowed to work on?

Evaluate responses using AI:

OFF

4.

OPEN ENDED QUESTION

3 mins • 1 pt

You encounter a system consisting of the following:

U16 gas meter
4m of 28mm copper
4m of 22mm copper
2m of 15mm copper
What is the volume of this system?

Evaluate responses using AI:

OFF

5.

OPEN ENDED QUESTION

3 mins • 1 pt

What is the purge volume for the system in question 4?

Evaluate responses using AI:

OFF

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which purge method would you use for the system in question 4?

Method 1

Method 2

7.

OPEN ENDED QUESTION

3 mins • 1 pt

Media Image

What are your first thoughts about this installation?

Evaluate responses using AI:

OFF

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?