It is a tool for maximizing or minimizing a quantity, typically a profit, or a cost, limited to the constraints.
2.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
What are the main component of linear programming problem?
Decision Variables
Objective Function
Constraints
Optimal Solution
3.
FILL IN THE BLANK QUESTION
1 min • 1 pt
Set of all points that satisfy all of the problem's resource restrictions
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
_________ are the restrictions or limitation imposed on the linear programming problem.
Cost
Variables
Constraints
Profit
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The type of constraints which specifies maximum capacity of a resource is _______________ constraints.
Less than
Less than or equal
Greater than
Greater than or equal
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
" A contractor can build at most 500 of an apartment,(x) and flat,(y) houses" . Convert the sentence given into inequality.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If the given inequality is greater than or greater than or equal, the region _______________ the straight line ax+by+c=0 has to be shaded.
below
above
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?