CIGRE Paris 2024

CIGRE Paris 2024

University

7 Qs

quiz-placeholder

Similar activities

Electrical Fault Diagnosis and Rectification

Electrical Fault Diagnosis and Rectification

University

10 Qs

MOMENT 2D

MOMENT 2D

University

8 Qs

Earthquakes

Earthquakes

KG - University

10 Qs

Crystals and Ceramics-Quiz#1

Crystals and Ceramics-Quiz#1

University

8 Qs

STATE OF MATTER

STATE OF MATTER

University

10 Qs

Hardest Test Ever MADE YOU WILL FAIL

Hardest Test Ever MADE YOU WILL FAIL

KG - University

8 Qs

Interpretasi Seismik

Interpretasi Seismik

University

10 Qs

Supernatural Quiz

Supernatural Quiz

5th Grade - Professional Development

8 Qs

CIGRE Paris 2024

CIGRE Paris 2024

Assessment

Quiz

Physics

University

Hard

Created by

Fooncy Fooncy

Used 3+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the importance of Fault Ride through

To protect the power system

To protect the generating equipment

To protect the transformer

To protect the transmission line

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In the Netherland situation, the SCADA breaker status indicated the wrong position. There was a blackout incident In Malaysia where an indicator error was an initial trigger to a blackout. Which incident was this?

Port Klang 2005

JMJG 2006

Paka 1996

Yong Peng North 2022

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the fault level of TNB 132kV?

8.6kA

32kA

40kA

32kV

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The initial trigger alone in India's and Brazil's situation was not sufficient to cause large disturbance to their respective power systems. What caused the situation to worsen?

Protection relay did not operate

insufficient System inertia

Incorrect switching

Inverter did not respond according to the model simulation

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is TNB's 275kV fault level?

30kA

50kA

25kA

40kA

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SF6 has a atmospheric lifespan of how many years?

3 years

3000 years

300 years

30 years

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the Poland large disturbance, the generators did not trip initially from the incorrect switching to earth. The generators did not trip initially because of?

System inertia

Fault ride through

SOTF

Transient fault