Geotechnics - Revision

Geotechnics - Revision

University

9 Qs

quiz-placeholder

Similar activities

IUCEE ConQuest: The Ultimate Technical Quiz Challenge

IUCEE ConQuest: The Ultimate Technical Quiz Challenge

University

10 Qs

Ring Leader: Lesson 2

Ring Leader: Lesson 2

9th Grade - University

11 Qs

Enzymes and Cell Disruption Quiz

Enzymes and Cell Disruption Quiz

University

10 Qs

AE4803Week15PresentationQuestions

AE4803Week15PresentationQuestions

University

14 Qs

Civil eng. const 1 slide 1

Civil eng. const 1 slide 1

University

11 Qs

Class II Flooding

Class II Flooding

University

10 Qs

foundation

foundation

University

10 Qs

Recap Sessions 16 & 17

Recap Sessions 16 & 17

11th Grade - University

10 Qs

Geotechnics - Revision

Geotechnics - Revision

Assessment

Quiz

Engineering

University

Hard

Created by

Eman Omairey

Used 1+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NON INTRUSIVE in-situ site investigation test?

SPT

CPT

VST

Geophysical tests

Pressuremeter test

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a primary objective of conducting a ground investigation in civil engineering projects?

Assess the suitability of a given site for the intended engineering
development.

To establish a detailed profile of underlying soil and rock for engineering purposes.

Potentially foresee any construction difficulties and plan both economical
and reliable remedial solutions

To determine the visual appeal of the construction site.

Assess the safety of existing neighbouring structures.

3.

REORDER QUESTION

1 min • 1 pt

Reorder the following ground investigation stages

Desk Study

Reconnaissance survey

Site investigation

Laboratory testing

Review of data and reporting

4.

OPEN ENDED QUESTION

1 min • 1 pt

Define ground investigation

Evaluate responses using AI:

OFF

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a problem linked to total uniform settlement in a building?

Connection with existing structures

Utility line breakage

Surface drainage problems

access of vehicles and pedestrians

cracks in the same building

6.

DROPDOWN QUESTION

30 sec • 1 pt

​ ​ (a)   is defined as the difference in total settlement between two foundations or two point on the same foundation​

Differential settlement
Total settlement
Consolidation settlement
Immediate settlement

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statements is TRUE about non-displacement (drilled shaft) piles?

They are pre-fabricated piles driven into the ground to displace soil.

They involve removing soil by boring or drilling and casting concrete to form the pile.

They are limited to small diameters and shallow depths.

They require a group of piles for each column, regardless of diameter.

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a disadvantage of non-displacement piling techniques?

They create significant soil disturbance around the pile.

They are unsuitable for use near existing structures in urban areas.

Pile defects may occur due to poor concrete compaction or wash-out in permeable layers.

They cannot accommodate complex pile shapes such as under-reams or flanges.

9.

DRAG AND DROP QUESTION

45 sec • 1 pt

The following are types of gravity retaining walls​ (a)   ​ (b)   ​ (c)   ​ (d)   ​ (e)  

mass walls
reinforced concrete walls
earth nail walls
crib walls
gabion walls
pile walls
sheet pile walls
diaphragm walls