Electrical Engineering Quiz

Electrical Engineering Quiz

Professional Development

26 Qs

quiz-placeholder

Similar activities

Cable and Electrical Safety Quiz

Cable and Electrical Safety Quiz

Professional Development

30 Qs

Electrical Engineering Quiz

Electrical Engineering Quiz

Professional Development

29 Qs

Electrical Cables Quiz

Electrical Cables Quiz

Professional Development

30 Qs

Electrical Engineering Quiz

Electrical Engineering Quiz

Professional Development

24 Qs

Insulin and Glucagon - Corso - Endo Exam 2

Insulin and Glucagon - Corso - Endo Exam 2

Professional Development

24 Qs

W/S CALCULATION & SCIENCE

W/S CALCULATION & SCIENCE

Professional Development

25 Qs

Electrical Cables and Safety Procedures Quiz

Electrical Cables and Safety Procedures Quiz

Professional Development

30 Qs

Electrical Engineering Quiz

Electrical Engineering Quiz

Professional Development

29 Qs

Electrical Engineering Quiz

Electrical Engineering Quiz

Assessment

Quiz

Mathematics

Professional Development

Easy

Created by

yusuf Abubakar

Used 1+ times

FREE Resource

26 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are stockbridge dampers used on the overhead line steel towers?

To reduce damage due to lightening

To increase conductor strength

To increase insulator resistance

To reduce damage due to vibration

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum open ground clearance for an LV overhead line?

6.4m

5.2m

2.8m

4.2m

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The purpose of screening 3-phase high voltage cables is to

Stop electrolytic action

Control tangential stresses

Provide good earth continuity

Give extra mechanical protection

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On a cable plan the letters ABSD may appear. This would refer to

Aerial bundled steel distributer

Air blast system disengager

Air break switch disconnector

Aerial balanced safety distancer

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tap changer has the ability to alter

The outgoing voltage

The incoming voltage

The outgoing current

The incoming current

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When handling cold pour resins the mandatory PPE would be

Overalls and eye protection

Disposable gloves and breathing apparatus

Breathing apparatus and overall

Eye protection and disposable gloves.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

By cable spiking what potential risk is being controlled or minimised

moisture

flashover

Results in deterioration

puncture

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?