1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the term backfilled mean

the soil under the footings is

filled with earth to the finished grade line

the outside of the foundation

walls is filled with earth to the finished grade line

the soil under the slab-on-grade is prepared for gravel installation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are footing drains commonly called in the construction industry in the loronto area

French drain

rigid pipes

weeping tile

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before plastic perforated pipe was used what material was used for footing drains

clay

PVC

WWF

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the abbreviation FD stand for on a foundation drawing

footing drain

floor drain

filter drain

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The thickness of polyethylene vapor barrier sheeting is measured in

mils

millimeters

decimeters

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What kind of insulation is usually used to insulate the foundation and concrete slabs

  • expanding foam

  • mineral wool

  • rigid plastic foam board

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In concrete slabs what is WWF the abbreviation for

water weeping fenestration

welded wire fabric

world wrestling federation

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?