Exam 2

Exam 2

Professional Development

100 Qs

quiz-placeholder

Similar activities

PCT Exam 3

PCT Exam 3

Professional Development

100 Qs

SOM Test

SOM Test

Professional Development

102 Qs

Health and Safety

Health and Safety

Professional Development

100 Qs

IT1 Exam 2 - Part 2

IT1 Exam 2 - Part 2

Professional Development

103 Qs

LET REVIEW GENED 1

LET REVIEW GENED 1

Professional Development

100 Qs

NURSING PRACTICE 3 📌 FINAL PROOF READ MAY NLE 2022

NURSING PRACTICE 3 📌 FINAL PROOF READ MAY NLE 2022

Professional Development

98 Qs

Med Term Chpt 12 The Eye

Med Term Chpt 12 The Eye

Professional Development

95 Qs

ajax

ajax

Professional Development

102 Qs

Exam 2

Exam 2

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Marc Brutas

Used 1+ times

FREE Resource

100 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Physical or mental effort work; work for which someone is paid is:

Equipment

Activity

Labor

Accomplishment

2.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

______ control category signifies that it is  1st priority activity and should be performed as needed  activity.

Limited

Variable

Unlimited

Project

3.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

The annual work quantity planned per inventory unit

Average daily production       

Crew size

Activity standard  

Quantity Standard

4.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

____ is prepared as a basis for assigning work thru verbal or written instructions

Schedule

Inspection report

Work program

Performance Budget

5.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which of the following Flood Control structure for protecting the river

bank from collapse by directing the flow away from the riverbank and

reduce the flow velocity near the bank?

Revetment

Dike

Spur Dike

Groundsill

6.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which of the following Flood Control structure designed for fixing the

riverbed and prevent it from further degradation? It is usually built

downstream of the bridge.

Revetment

Dike

Spur Dike

Groundsill

7.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which of the following Flood Control structure for protecting the river

bank from collapse brought about by erosion, scouring and degradation?

Revetment

Dike

Spur Dike

Groundsill

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?