Water Supply Regulations Quiz
Authored by Stuart Allan
Professional Development
Professional Development

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
5 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to WRAS guidance (G12.2), what should happen to the pressure in the system over the next one hour period during testing?
The pressure should increase
The pressure should drop below the test pressure
The pressure should remain constant with no visible leakage
The pressure should fluctuate
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does WRAS recommendation R12.2 state about testing rigid pipe systems?
All outlets should be left open
The pressure should be decreased by 50%
The pressure should be maintained for one hour without further pumping
The system should be tested for five minutes
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to BS EN 806, what should the maximum design pressure be in relation to the maximum operating pressure?
1.2 times the maximum operating pressure
1.5 times the maximum operating pressure
2 times the maximum operating pressure
Equal to the maximum operating pressure
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step in pressure testing a rigid metallic pipe according to BS EN 806?
Attach the hydraulic test bucket
Slowly fill the system with water
Pump the system to maximum pressure
Check for pressure drop
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For larger installations, how should the system be treated after flushing?
Re-filled with water
Disinfected as described in BS EN 806
Vent at outlets and high level
Open all taps
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?