DDT 19

DDT 19

Professional Development

40 Qs

quiz-placeholder

Similar activities

RIA Mock ver 3

RIA Mock ver 3

University - Professional Development

40 Qs

Anatomy and Body Systems pt.3

Anatomy and Body Systems pt.3

Professional Development

35 Qs

CU06:APPERTIZER PRODUCTION

CU06:APPERTIZER PRODUCTION

Professional Development

41 Qs

Intellectual Property Rights

Intellectual Property Rights

Professional Development

38 Qs

Car Maintenance 3-22-2022

Car Maintenance 3-22-2022

Professional Development

38 Qs

Fortnite Chapter 2 season 4

Fortnite Chapter 2 season 4

KG - Professional Development

37 Qs

Core Solutions Q1 2022

Core Solutions Q1 2022

Professional Development

40 Qs

creative imedia

creative imedia

11th Grade - Professional Development

40 Qs

DDT 19

DDT 19

Assessment

Quiz

Other

Professional Development

Practice Problem

Easy

Created by

Driver Training

Used 116+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Who is authorised to remove a Safety Banner once it has been placed? 

The signaller of that location

Only the person who placed the banner

The cleaners of the train

All of the above

The driver of the train

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

If an Overhead defect affects other lines, what kind of radio call must be made? 

TEC

Local

REC

Cab to Cab

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

If the Overhead has become disarranged, should an Emergency Track Circuit Jumper Cable be used? 

Yes

No

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

At Tram Way Crossings in times of failure, what may the Driver be required to do?

Proceed through the Tram Way Crossing as per signal aspects

Supply 1500v DC Power to the Tram Way 600v DC System by remaining stationary on the Tram Way Crossing

Declare the Train Disabled

Coast under the Tram Way Crossing in order to not overload the Tram Way Overhead System

5.

MULTIPLE SELECT QUESTION

2 mins • 1 pt

Which controls are located under the lid of the Electro-Hydraulic Point Machine (EHPM)? (Select three (3) responses) 

Red Directional Control Lever

Power/Manual Switch

Selector Lever

Pump handle socket

Hand Throw Lever

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is the authority to setback in the Metrol Controlled Area (excluding the MURL)? 

Train Authority issued by the Train Controller

Verbal Permission from the Train Controller

Verbal Authority from the Area Controller and the move supervised by the Senior Network Controller

Signaller’s Caution Order issued by the Area Controller

7.

MULTIPLE SELECT QUESTION

2 mins • 1 pt

How can Train Authorities be issued to a driver? (Select two (2) responses) 

Handed

Transmitted

Dictated

On a CAN notice

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?