302-L1-MOCK

302-L1-MOCK

12th Grade

60 Qs

quiz-placeholder

Similar activities

Measuring tools, equipment, and equivalents

Measuring tools, equipment, and equivalents

9th - 12th Grade

55 Qs

WHS Construction Semester Test

WHS Construction Semester Test

9th - 12th Grade

60 Qs

Finley Illustrator ACA Skills Quiz

Finley Illustrator ACA Skills Quiz

6th Grade - University

62 Qs

Higher Graphics_Revision Quiz 1

Higher Graphics_Revision Quiz 1

12th Grade

55 Qs

Measurements Test

Measurements Test

10th Grade - University

60 Qs

Chapter 12 Prostart Smallwares

Chapter 12 Prostart Smallwares

10th - 12th Grade

64 Qs

The World of Lodging - Study Guide

The World of Lodging - Study Guide

12th Grade

57 Qs

IED 3rd Quarter Review

IED 3rd Quarter Review

9th - 12th Grade

59 Qs

302-L1-MOCK

302-L1-MOCK

Assessment

Quiz

Other

12th Grade

Medium

Created by

Danny Chadwick

Used 4+ times

FREE Resource

60 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of BS EN standards in engineering?

To establish uniform aesthetic guidelines across industries

To ensure safety, reliability, and interoperability of products

To minimize the environmental impact of engineering processes

To enhance the competitive edge of European companies globally

Answer explanation

The primary purpose of BS EN standards in engineering is to ensure safety and trust. These standards provide guidelines that help maintain quality and safety in engineering practices, which is crucial for public confidence.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of diagram is an Ishikawa diagram also known as?

Fishbone chart

Pareto chart

Venn diagram

Histogram

Answer explanation

An Ishikawa diagram is also known as a Fishbone chart because its structure resembles the bones of a fish, helping to identify cause-and-effect relationships in a process.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In engineering drawings, what does the term "orthographic projection" refer to?

A method of representing three-dimensional objects in two dimensions using multiple views

A technique for visualizing objects in a single perspective view

A system for assigning colors to different parts of a drawing

A list of materials required for a project

Answer explanation

Orthographic projection is a method of representing three-dimensional objects in two dimensions. It uses multiple views (top, front, side) to convey the shape and dimensions accurately, making '2D view' the correct choice.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which CAD system feature is crucial for ensuring precision in engineering drawings?

Parametric constraints

Layer management

3D rendering

Virtual reality integration

Answer explanation

Layer tools are essential in CAD systems as they allow users to organize different elements of a drawing separately. This organization helps in producing accurate engineering drawings by managing visibility and editing of components effectively.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the significance of continuous dimensions in engineering drawings?

To ensure precise manufacturing and assembly by providing exact measurements

To indicate the type of surface finish required

To specify the color coding of different parts

To identify the load-bearing capacity of materials

Answer explanation

Continuous dimensions in engineering drawings are crucial as they provide precise measurements, ensuring that parts fit together correctly and function as intended. This is why the correct answer is 'To show measurements'.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a key principle of document control in engineering?

Ensuring document confidentiality

Track versions

Implementing document encryption

Automating document approval processes

Answer explanation

Tracking versions is essential in document control to ensure that all changes are recorded, allowing for accurate reference and retrieval of the most current information. This prevents confusion and maintains integrity in engineering documentation.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of Gantt charts in the context of complex engineering projects?

To illustrate the critical path and dependencies between project tasks

To calculate the financial budget and resource allocation

To design and simulate engineering components and systems

To conduct quality assurance and material testing procedures

Answer explanation

Gantt charts are primarily used to show project timelines, illustrating the start and finish dates of various tasks within a project. This helps in planning and tracking progress effectively.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?