Search Header Logo

Landscape Services

Authored by Season Klein-Taylor

Others

KG

Used 3+ times

Landscape Services
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

70 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The final step prior to seedbed preparation or planting is known as ________.

Rough grading

Re-spreading topsoil

Erosion Control

Blue Topping

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_______ wood may contain no more than 12 percent water.

S-Grn

S-Dry

KD - Kiln Dried

None of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To provide stability, irregular-shaped stone should make contact with adjacent stones at a minimum of _______ points.

2

3

4

5

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A _______ roller consists of a drum with metal projecting “feet” attached.

Smooth wheel

Pneumatic

Vibratory

Sheepsfoot

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Anything less than _______ primary consolidation, soil compression and settlement of the overlying structure are still progressing.

25%

50%

75%

100%

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT an approach to subsurface drainage?

French drain

Swales

Perforated tile

Storm sewers

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A paint glove or a brush is the best tool when painting a _______.

Chain link fence

Wire mesh fence

Siding fence

Pipe fence

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?