Engosoft Training & Consulting Quiz

Engosoft Training & Consulting Quiz

12th Grade

14 Qs

quiz-placeholder

Similar activities

G7 Unit2 Review

G7 Unit2 Review

7th Grade - University

15 Qs

Fuel and Emission Control Quiz

Fuel and Emission Control Quiz

12th Grade - University

15 Qs

Greek & Latin Roots Quiz 19

Greek & Latin Roots Quiz 19

5th Grade - University

17 Qs

Vibrations Quiz - Multi Degree of Freedom Systems

Vibrations Quiz - Multi Degree of Freedom Systems

12th Grade - University

10 Qs

Towards Becoming a Professional Engineer

Towards Becoming a Professional Engineer

3rd Grade - University

10 Qs

L2 U201 Health and Safety Quiz

L2 U201 Health and Safety Quiz

12th Grade

11 Qs

Mastering Java Arithmetic Operators

Mastering Java Arithmetic Operators

10th Grade - University

10 Qs

FORMATIVE ASSESSMENT 3: AC GENERATOR

FORMATIVE ASSESSMENT 3: AC GENERATOR

12th Grade

10 Qs

Engosoft Training & Consulting Quiz

Engosoft Training & Consulting Quiz

Assessment

Quiz

Engineering

12th Grade

Practice Problem

Medium

Created by

Islam Kamal

Used 7+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary role of the Owner in a project?

To supervise the construction

To fund the project

To provide materials

To design the project

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What does the Consultant do during the pre-design phase?

Implement the project

Conduct site supervision

Create the initial layout

Review the budget

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following is a task of the Contractor?

Review the project specifications

Prepare the initial layout

Design the project

Execute the project on-site

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is included in the coordination between different specialties?

Only structural engineering

Architecture, Interior Design, Structure, Electromechanical

Only electromechanical systems

Only architecture

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which software is mentioned for drawing sketches?

Photoshop

SketchUp

AutoCAD

Revit

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What does the acronym BOQ stand for?

Bill of Quantities

Budget of Quality

Basis of Quotations

Balance of Quantities

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the role of the Facility Manager?

To design the project

To manage the construction site

To oversee facility operations

To provide financial support

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?