Heating Systems Quiz

Heating Systems Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

Central Heating Quiz

Central Heating Quiz

12th Grade

15 Qs

Hot Water Systems Quiz

Hot Water Systems Quiz

12th Grade

20 Qs

Exploring Pneumatic Technology

Exploring Pneumatic Technology

12th Grade - University

15 Qs

Ulangan Harian 2 Mapel PMKR

Ulangan Harian 2 Mapel PMKR

12th Grade

20 Qs

Mastering Time and Work Concepts

Mastering Time and Work Concepts

12th Grade - University

20 Qs

Heating Systems Quiz

Heating Systems Quiz

12th Grade

20 Qs

Basic Hydraulics Final

Basic Hydraulics Final

9th - 12th Grade

20 Qs

Lesson 6 System Terminology and Concepts

Lesson 6 System Terminology and Concepts

12th Grade - University

15 Qs

Heating Systems Quiz

Heating Systems Quiz

Assessment

Quiz

Engineering

12th Grade

Medium

Created by

benjamin richardson

Used 3+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the C plan two-pipe semi-gravity system comply with?

Building regulations L1B

Energy efficiency standards

Environmental protection laws

Safety guidelines

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What level of control does the C plan two-pipe semi-gravity system offer?

Limited control on heating

Full control on heating and hot water

No control on hot water

Partial control on heating

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which aspect of the C plan two-pipe semi-gravity system is related to building regulations?

Efficiency

Compliance

Control

Pumping

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum circulatory pressure required in the system?

0.5m

1m

1.5m

2m

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of pipes are used for primary circulation in the system?

Forced circulation pipes

Gravity primary circulating pipes

Direct circulation pipes

Indirect circulation pipes

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a disadvantage of the two-pipe semi-gravity system with heat sink?

Restricted heat control

Can be expensive

Compliant with building regulations (Part L)

Reduced efficiency

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the feed and expansion cistern in a pumped central heating system?

To store hot water for immediate use

To allow for the expansion of water as it heats

To pump water through the system

To filter impurities from the water

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Engineering