Implementation Methods in IT Systems

Authored by Waqqad Rasheed

Computers

12th Grade

Used 2+ times

Implementation Methods in IT Systems
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which implementation method runs both the old and new systems simultaneously?

A. Pilot implementation

B. Direct changeover

C. Parallel running

D. Phased implementation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key advantage of direct changeover?

A. It is the least risky implementation method.

B. It ensures consistent data usage by using one system at a time.

C. It allows errors to be fixed before full deployment.

D. It is a slower method to reduce risk.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a disadvantage of phased implementation?

A. The new system is not beta-tested by a group of users.

B. Both systems must run simultaneously for an extended period.

C. Users might be confused about which system to use for specific tasks.

D. It does not allow for incremental training.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In pilot implementation, what role does the pilot group play?

A. They serve as a backup for the new system.

B. They use the new system exclusively to ensure compatibility with the old system.

C. They beta-test the new system and may train other users.

D. They identify all data inconsistencies in the old system.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is parallel running considered less risky?

A. Errors in the new system only affect the pilot group.

B. Both systems do not require compatibility for data sharing.

C. The old system remains operational if the new system fails.

D. It allows for the quickest transition between systems.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a disadvantage of direct changeover?

A. Users may experience delays during implementation.

B. There is a high risk of system failure with no fallback.

C. Errors are limited to specific phases rather than the entire system.

D. The organisation needs to install additional hardware for the transition.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which implementation method introduces parts of the new system incrementally?

A. Phased implementation

B. Pilot implementation

C. Parallel running

D. Direct changeover

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?