1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If one is unable to use joist hangers to install floor joists, what has to be cut and nailed for the joists to rest on?
ledgers
rafters
studs
top plates
Answer explanation
If joist hangers cannot be used, ledgers must be cut and nailed to provide a stable surface for the floor joists to rest on. Ledgers are horizontal supports that help secure the joists in place.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When Sheri is framing a building, sills are installed:
anytime.
first.
last.
sixth.
Answer explanation
Sills are the horizontal members that support the structure above and are installed first in the framing process. This foundational step is crucial for ensuring stability and alignment in the building.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In platform-type framing, the wall studs are nailed:
on the soleplate.
on the ledger.
to the rafters.
to the sills.
Answer explanation
In platform-type framing, wall studs are nailed on the soleplate, which is the bottom horizontal member of the wall frame. This provides a stable base for the studs to be secured vertically.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When Jan uses platform-type framing, where is the top plate attached?
above the ceiling joists
below the studs
on top of the rafters
on top of the studs
Answer explanation
In platform-type framing, the top plate is attached on top of the studs. This method provides a solid base for the wall framing and supports the structure above.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If one end of a stud is nailed to the sole plate, where should the other end be nailed?
ceiling joist
floor joist
Answer explanation
The stud should be nailed to the floor joist because it provides vertical support for the wall structure. Nailing it to the ceiling joist would not provide the necessary stability for the wall.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a major advantage of using metal framing anchors?
eliminate floor joists from the framing system
reduce splitting wood caused by toenailing
replace the need for a subfloor system
straighten warped studs
Answer explanation
Using metal framing anchors helps reduce splitting wood caused by toenailing, as they provide a more secure connection without the risk of damaging the wood, making the framing process more efficient.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When lumber is used for the horizontal parts of framing, where should the crown of a warped board be located?
bottom
left side
right side
top
Answer explanation
The crown of a warped board should be placed at the top when used in horizontal framing. This positioning helps to ensure that the board remains level and provides better structural integrity.
Create a free account and access millions of resources
Similar Resources on Wayground
22 questions
PBS 1.1.2 Reliable Witnesses

Quiz
•
9th - 12th Grade
20 questions
Newton's 1st and 2nd Laws of Motion

Quiz
•
11th Grade
20 questions
Practice With Graphs

Quiz
•
9th - 12th Grade
22 questions
Cells and magnification

Quiz
•
9th - 11th Grade
25 questions
Pendulum

Quiz
•
9th Grade - University
25 questions
Biospheres

Quiz
•
9th - 12th Grade
25 questions
Arkio

Quiz
•
5th Grade - University
25 questions
Wall Framing

Quiz
•
5th Grade - University
Popular Resources on Wayground
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
20 questions
PBIS-HGMS

Quiz
•
6th - 8th Grade
10 questions
"LAST STOP ON MARKET STREET" Vocabulary Quiz

Quiz
•
3rd Grade
19 questions
Fractions to Decimals and Decimals to Fractions

Quiz
•
6th Grade
16 questions
Logic and Venn Diagrams

Quiz
•
12th Grade
15 questions
Compare and Order Decimals

Quiz
•
4th - 5th Grade
20 questions
Simplifying Fractions

Quiz
•
6th Grade
20 questions
Multiplication facts 1-12

Quiz
•
2nd - 3rd Grade