power system

power system

University

13 Qs

quiz-placeholder

Similar activities

Power Electronics - 2

Power Electronics - 2

University

10 Qs

Basic Electronic Knowledge

Basic Electronic Knowledge

University

15 Qs

DC Motor Speed Control - From Basic to Breakthroughs

DC Motor Speed Control - From Basic to Breakthroughs

University

10 Qs

Train Lighting Systems Quiz

Train Lighting Systems Quiz

University

10 Qs

Introduction to Electric Circuit Analysis

Introduction to Electric Circuit Analysis

University

10 Qs

HWR Review

HWR Review

University

9 Qs

Quiz on Magnetic Circuit & Transformer

Quiz on Magnetic Circuit & Transformer

University

13 Qs

Basic Electrical Concepts Assessment

Basic Electrical Concepts Assessment

University

13 Qs

power system

power system

Assessment

Quiz

Engineering

University

Easy

Created by

gite gite

Used 1+ times

FREE Resource

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A fully transposed transmission line has

  1. equal positive and zero sequence impedances

  1. positive sequence impedances of zero always

  1. equal negative and zero sequence impedances

  1. equal positive and negative sequence impedances

all of this above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of a synchronous condenser in a power system?

  1. To adjust voltage and control reactive power by varying its excitation

  1. To operate as a generator for supplying real power

  1. To supply real power to the grid

  1. To absorb both real and reactive power from the grid

option A & D

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which is the first nuclear power plant in india

tarapur

narora

rana pratap

kalpakkam

koradi, nagpur

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A consumer consumes 600 kWh per day at a load factor of 0.5. Without increasing the maximum demand, if the consumer increases the load factor to 0.8, the consumption of energy in kWh would be

480

960

900

300

100

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

how to calculate reserve capacity of power plant

Reserve capacity = Plant Capacity / Maximum Demand

Reserve capacity = Plant Capacity + Maximum Demand

Reserve capacity = Plant Capacity * Maximum Demand

Reserve capacity = Plant Capacity – Maximum Demand

Reserve capacity = Plant Capacity Maximum Demand 1.5

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The given symbol is lighting circuit fuse boards of ___

distribution fuse board with switches

Main fuse board with switch

  1. Distribution fuse board without switches

  1. Main fuse board without switches

control board

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The minimum clearance distance in foot that equipment should be kept away from 50 kV power lines is:

20

10

15

5

1.5

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?