Process Selection and Facility Layout Quiz

Process Selection and Facility Layout Quiz

12th Grade

11 Qs

quiz-placeholder

Similar activities

Chapitre introductif: économie, sociologie, science politique

Chapitre introductif: économie, sociologie, science politique

1st - 12th Grade

10 Qs

Konflik Sosial

Konflik Sosial

10th - 12th Grade

10 Qs

Demand

Demand

KG - 12th Grade

10 Qs

Material or Non-Material

Material or Non-Material

12th Grade

10 Qs

Quiz - Enlightenment

Quiz - Enlightenment

12th Grade

10 Qs

Pre-Test

Pre-Test

11th - 12th Grade

10 Qs

IPS 8 ASEAN P2

IPS 8 ASEAN P2

12th Grade

10 Qs

Process Selection and Facility Layout Quiz

Process Selection and Facility Layout Quiz

Assessment

Quiz

Social Studies

12th Grade

Practice Problem

Easy

Created by

Harpreet 15604

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of process would a Cement plant be most likely to use?

Continuous flow

Batch

Job shop

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Job shop and batch processing are differentiated on the basis of:

Job requirements

Degree of standardization

Volume of output

Both (b) and (c)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The type of operation being carried out by an organization depends upon:

Degree of standardization

Volume of output

Demand

Both (a) and (b)

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Product layout is preferably used for:

Continuous processing

Intermittent processing

Both (a) and (b)

Neither (a) nor (b)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Process layout is used for:

Repetitive processing

Intermittent processing

Both (a) and (b)

Neither (a) nor (b)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following would not be an operations activity in a fast-food restaurant?

Advertising new salad dishes

Purchasing tomatoes

Planning the layout of the serving areas

Cooking chilly cheese and dalmakhani

7.

OPEN ENDED QUESTION

3 mins • 1 pt

Calculate Cycle time to obtain the desired output of 400 units in an eight hour (effective) working day.

Evaluate responses using AI:

OFF

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?