Bored Pile Foundation Quiz

Bored Pile Foundation Quiz

12th Grade

18 Qs

quiz-placeholder

Similar activities

Asynchronous AR 2.0

Asynchronous AR 2.0

8th Grade - University

20 Qs

Foundation Selection Quiz

Foundation Selection Quiz

12th Grade

18 Qs

Evaporation and Transpiration Quiz

Evaporation and Transpiration Quiz

12th Grade - University

15 Qs

Stream Flow Measurement Quiz

Stream Flow Measurement Quiz

12th Grade - University

15 Qs

Unit 2 CA Review

Unit 2 CA Review

7th Grade - University

20 Qs

Tunnel Construction Quiz

Tunnel Construction Quiz

12th Grade

15 Qs

Retaining Walls Quiz

Retaining Walls Quiz

12th Grade

13 Qs

Tall Buildings paper-Springer-Poulos

Tall Buildings paper-Springer-Poulos

12th Grade

15 Qs

Bored Pile Foundation Quiz

Bored Pile Foundation Quiz

Assessment

Quiz

Engineering

12th Grade

Hard

Created by

Navid Mehreganian

FREE Resource

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are bored piles popular in urban areas?

They are cost-effective

They require minimal vibration

They are easy to transport

They are environmentally friendly

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is inserted into the drilled hole before the pile is poured?

A wooden frame

A temporary steel cylinder

A plastic tube

A concrete block

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the bored pile construction process?

Pouring concrete

Drilling a vertical hole

Inserting a rebar cage

Capping the pile

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first stage in bored pile construction?

Insert reinforcement

Drilling

Cast concrete

Finished pile

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it advised to have bored piling work performed by a specialized contractor?

It is cheaper

It requires extensive knowledge and experience

It is faster

It is less labor-intensive

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common challenge with drilling on cohesionless soil?

It is too easy

It causes a mess

It is faster

It requires less equipment

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the third stage in bored pile construction?

Drilling

Insert reinforcement

Cast concrete

Finished pile

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?