U4-HNC_Procurement Method

U4-HNC_Procurement Method

12th Grade

18 Qs

quiz-placeholder

Similar activities

Arch. Introduction & Professionalism

Arch. Introduction & Professionalism

9th - 12th Grade

20 Qs

Robotics Day 5

Robotics Day 5

8th Grade - University

15 Qs

Unit 1 midterm (Science Review) 2024

Unit 1 midterm (Science Review) 2024

12th Grade

13 Qs

Lesson 6 System Terminology and Concepts

Lesson 6 System Terminology and Concepts

12th Grade - University

15 Qs

Lesson 1: VEX IQ Sensors

Lesson 1: VEX IQ Sensors

7th Grade - University

14 Qs

Lesson 4 Angular Motion

Lesson 4 Angular Motion

12th Grade - University

13 Qs

Gravity

Gravity

10th Grade - University

20 Qs

U4-HNC_Procurement Method

U4-HNC_Procurement Method

Assessment

Quiz

Engineering

12th Grade

Practice Problem

Hard

Created by

Navid Mehreganian

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary responsibility of the structural engineer in the traditional system?

To manage the client

To provide structural engineering services

To conduct quantity surveys

To oversee subcontractors

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process called when a design team is transferred to the building team in D&B procurement?

Transition

Novation

Delegation

Conversion

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a variation of D&B project procurement?

Novated D&B

Traditional D&B

Integrated D&B

Sequential D&B

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the context of D&B, what does the contractor need to ensure?

Financial backing

Closer collaboration and risk management

Minimal involvement

Separate design and construction teams

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a feature of the Design and Build procurement method?

Separate contracts for design and construction

Single contract for both design and construction

Only design is contracted

Only construction is contracted

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Management Contracting, who manages the series of 'works' contractors?

The client

The management contractor

The architect

The project manager

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key factor in avoiding risks in Management Contracting?

Appointing unknown subcontractors

Appointing trusted subcontractors

Delaying project involvement

Increasing project costs

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?