U4-HNC_Procurement Method

U4-HNC_Procurement Method

12th Grade

18 Qs

quiz-placeholder

Similar activities

Building Information Modelling (BIM) Quiz

Building Information Modelling (BIM) Quiz

12th Grade

15 Qs

Plastics Presentation Class Review

Plastics Presentation Class Review

9th - 12th Grade

20 Qs

U9- BTEC-A.2- Lead Times in Construction Projects

U9- BTEC-A.2- Lead Times in Construction Projects

12th Grade

15 Qs

Quality Management Techniques in Construction Quiz

Quality Management Techniques in Construction Quiz

12th Grade

19 Qs

Value Engineering

Value Engineering

12th Grade - University

15 Qs

Chilean Bridge Design

Chilean Bridge Design

10th Grade - University

20 Qs

Fusion 360 IBC Review 1

Fusion 360 IBC Review 1

9th - 12th Grade

20 Qs

PLTW EOC Eng Ess Test Review 3

PLTW EOC Eng Ess Test Review 3

9th - 12th Grade

20 Qs

U4-HNC_Procurement Method

U4-HNC_Procurement Method

Assessment

Quiz

Engineering

12th Grade

Hard

Created by

Navid Mehreganian

FREE Resource

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary responsibility of the structural engineer in the traditional system?

To manage the client

To provide structural engineering services

To conduct quantity surveys

To oversee subcontractors

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process called when a design team is transferred to the building team in D&B procurement?

Transition

Novation

Delegation

Conversion

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a variation of D&B project procurement?

Novated D&B

Traditional D&B

Integrated D&B

Sequential D&B

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the context of D&B, what does the contractor need to ensure?

Financial backing

Closer collaboration and risk management

Minimal involvement

Separate design and construction teams

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a feature of the Design and Build procurement method?

Separate contracts for design and construction

Single contract for both design and construction

Only design is contracted

Only construction is contracted

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Management Contracting, who manages the series of 'works' contractors?

The client

The management contractor

The architect

The project manager

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key factor in avoiding risks in Management Contracting?

Appointing unknown subcontractors

Appointing trusted subcontractors

Delaying project involvement

Increasing project costs

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?