PPT 9 - Install and test systems and components

PPT 9 - Install and test systems and components

12th Grade

28 Qs

quiz-placeholder

Similar activities

NCCER 00104 Power tools 6th edition

NCCER 00104 Power tools 6th edition

9th - 12th Grade

24 Qs

Safety Management Quiz

Safety Management Quiz

12th Grade

24 Qs

Drainage System Quiz

Drainage System Quiz

12th Grade

25 Qs

Construction Knowledge Quiz

Construction Knowledge Quiz

12th Grade

25 Qs

Central Heating Pictures Quiz

Central Heating Pictures Quiz

12th Grade - University

23 Qs

System Components quiz

System Components quiz

12th Grade - University

26 Qs

Quiz on Circular Saw and Work Equipment Test A

Quiz on Circular Saw and Work Equipment Test A

12th Grade - University

30 Qs

wle final

wle final

12th Grade

30 Qs

PPT 9 - Install and test systems and components

PPT 9 - Install and test systems and components

Assessment

Quiz

Construction

12th Grade

Practice Problem

Medium

Created by

Adam Dreifuss

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

28 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the requirements for a plumbing system after installation?

It must be painted.

It must be sound (no leaks).

It must be expanded.

It must be insulated.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "flushed through" mean in the context of plumbing?

Painted externally

Cleaned internally

Expanded in size

Insulated properly

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "disinfected" refer to in plumbing system testing?

Mechanically cleaned

Painted with a sealant

Chemically cleaned

Expanded for more capacity

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "commissioned" mean in the context of plumbing?

Set up correctly

Painted and sealed

Expanded and insulated

Mechanically adjusted

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing process?

Visual inspection

Soundness test

Deccomission

Flushing out

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step comes immediately after the soundness test in the testing process?

Visual inspection

Flushing out

Disinfecting

Hand over to customer

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the testing process before handing over to the customer?

Commissioning

Visual inspection

Soundness test

Flushing out & Disinfecting

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?