PPT 9 - Install and test systems and components

PPT 9 - Install and test systems and components

12th Grade

28 Qs

quiz-placeholder

Similar activities

HART-1303 – Air Conditioning Controls Principles- FINAL

HART-1303 – Air Conditioning Controls Principles- FINAL

12th Grade

25 Qs

Earth and Water Quiz

Earth and Water Quiz

12th Grade

30 Qs

2365 602 RJH2

2365 602 RJH2

12th Grade

25 Qs

Building Design and Materials Quiz

Building Design and Materials Quiz

12th Grade

30 Qs

NCCER Introductory Craft Skills Quiz

NCCER Introductory Craft Skills Quiz

12th Grade

23 Qs

Continuous Professional Development Quiz

Continuous Professional Development Quiz

12th Grade

27 Qs

AC1.3 Water Supply in the UK

AC1.3 Water Supply in the UK

12th Grade

32 Qs

PPT 6 - Installation and backflow prevention

PPT 6 - Installation and backflow prevention

12th Grade

27 Qs

PPT 9 - Install and test systems and components

PPT 9 - Install and test systems and components

Assessment

Quiz

Construction

12th Grade

Medium

Created by

Adam Dreifuss

Used 2+ times

FREE Resource

28 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the requirements for a plumbing system after installation?

It must be painted.

It must be sound (no leaks).

It must be expanded.

It must be insulated.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "flushed through" mean in the context of plumbing?

Painted externally

Cleaned internally

Expanded in size

Insulated properly

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "disinfected" refer to in plumbing system testing?

Mechanically cleaned

Painted with a sealant

Chemically cleaned

Expanded for more capacity

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does "commissioned" mean in the context of plumbing?

Set up correctly

Painted and sealed

Expanded and insulated

Mechanically adjusted

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing process?

Visual inspection

Soundness test

Deccomission

Flushing out

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step comes immediately after the soundness test in the testing process?

Visual inspection

Flushing out

Disinfecting

Hand over to customer

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the testing process before handing over to the customer?

Commissioning

Visual inspection

Soundness test

Flushing out & Disinfecting

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?