Chilean Bridge Design

Chilean Bridge Design

10th Grade

20 Qs

quiz-placeholder

Similar activities

Industrial Engineering Quiz

Industrial Engineering Quiz

University

23 Qs

EDP(03/07/25): Engineering Design and Presentation

EDP(03/07/25): Engineering Design and Presentation

10th Grade

15 Qs

Technical Quiz

Technical Quiz

University

25 Qs

General Engineering

General Engineering

11th Grade

16 Qs

1.1.3 - Common Traits of Good Engineers

1.1.3 - Common Traits of Good Engineers

10th Grade - University

20 Qs

PLTW Engineering Essentials

PLTW Engineering Essentials

11th Grade

20 Qs

Value Engineering

Value Engineering

12th Grade - University

15 Qs

OPM_Quiz1

OPM_Quiz1

University

20 Qs

Chilean Bridge Design

Chilean Bridge Design

Assessment

Quiz

Engineering

10th Grade

Hard

Created by

Jason Rauch

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What was the primary purpose of the Valdivia Drawbridge project in Chile?

To create a tourist attraction

To alleviate traffic congestion and improve access for cargo ships

To replace an old bridge

To connect two cities

Answer explanation

The primary purpose of the Valdivia Drawbridge project was to alleviate traffic congestion and improve access for cargo ships, enhancing transportation efficiency in the region.

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What issue did Miguel Sofia face during his investigation of the bridge's construction?

Lack of funding

Restricted access and unwillingness to provide information

Natural disasters

Language barriers

Answer explanation

Miguel Sofia faced restricted access and an unwillingness to provide information during his investigation, which hindered his ability to gather necessary data about the bridge's construction.

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What was one of the most apparent issues with the Valdivia Drawbridge?

The bridge was too short

The bicycle lanes stopped abruptly

The bridge was too expensive

The bridge was too narrow

Answer explanation

One of the most apparent issues with the Valdivia Drawbridge was that the bicycle lanes stopped abruptly, creating a safety hazard for cyclists and disrupting the flow of traffic.

4.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What could happen if a drawbridge is installed backward?

It could improve traffic flow

It could lead to improper drainage and alignment of hydraulic arms

It could increase the bridge's lifespan

It could reduce construction costs

Answer explanation

Installing a drawbridge backward can misalign the hydraulic arms, crucial for operation, and cause drainage issues, compromising functionality and safety.

5.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What financial impact did the mistakes during the construction of the Valdivia drawbridge have?

Reduced costs significantly

Exceeded the budget by millions

Had no impact on the budget

Saved money on construction

Answer explanation

The construction mistakes of the Valdivia drawbridge led to significant financial overruns, causing the project to exceed its budget by millions, highlighting the costly consequences of errors in large infrastructure projects.

6.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What solution are engineers working on to address some issues with the Valdivia drawbridge?

Building a new bridge

Leveling the road surface and correcting the bicycle lane's placement

Painting the bridge

Adding more lanes

Answer explanation

Engineers are focusing on leveling the road surface and correcting the bicycle lane's placement to improve safety and functionality of the Valdivia drawbridge, addressing specific issues rather than constructing a new bridge.

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

What does the Valdivia drawbridge project highlight about modern engineering?

The simplicity of construction projects

The importance of proper planning, communication, and quality control

The irrelevance of budgeting

The ease of project management

Answer explanation

The Valdivia drawbridge project highlights the necessity of thorough planning, effective communication, and strict quality control in modern engineering to ensure successful project completion.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?