6035 Cold Water Questions
Authored by Robert Coope-Moss
Other
Vocational training
Used 25+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When installing a new indirect cold water system, which of the following should happen, according to the Water Regulations?
One tap, normally the kitchen sink, should be drawn directly from the supply pipe
One tap, normally the kitchen sink, should have a dedicated distribution pipe from the storage cistern
Mixer taps will require double check valves
Mixer taps should never be installed due to the pressure differences.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to BS6700 and the Water Regulations, a drain off valve should be installed:
At every draw off point
At every high point in the system
At every low point in the system
Above the cold water storage cistern.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Pin holing in copper pipework is commonly caused by:
Hard water
Acidic water
Alkaline water
Pure water.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
While installing pipework in a property, you are called off site to another job. What would be the correct course of action with any open-ended pipework?
Place a warning label on every open end
Cap off with a push fit fitting
Warn the customer not to interfere with any pipework
Be as quick as you can to return.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
One of the major problems when leaving a dead leg in a cold water pipe is:
Electrolytic corrosion
Pitting of pipework
Reduction in water flow
Possible bacterial growth.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The use of WRAS approved fittings when installing cold water pipework is:
A legal requirement
To be corrosion resistant
To avoid contamination
All of the above.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
On the completion of a new cold water installation, the system has been proven sound. What would the next course of action be?
Visual inspection with the customer
Flush the pipework out then hand over to the customer
Prepare the benchmark certificate
Hand over to the customer
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?