Site Preparation and pipework fabrication

Site Preparation and pipework fabrication

Vocational training

11 Qs

quiz-placeholder

Similar activities

Phcc  Ch 8 : Square Roots

Phcc Ch 8 : Square Roots

KG - University

14 Qs

Unit 104 first fix Installation Quiz

Unit 104 first fix Installation Quiz

11th Grade

15 Qs

Plumbing Health and Safety Quiz

Plumbing Health and Safety Quiz

12th Grade

14 Qs

FBC: Building Finishes

FBC: Building Finishes

University

12 Qs

Quiz on Plastic Pressure Pipes

Quiz on Plastic Pressure Pipes

12th Grade

15 Qs

Unit 109 power point 3 2025

Unit 109 power point 3 2025

KG - University

13 Qs

Cold Water Storage Cistern

Cold Water Storage Cistern

KG - University

15 Qs

Pipes and Fittings, Plumbing Fixtures

Pipes and Fittings, Plumbing Fixtures

University

13 Qs

Site Preparation and pipework fabrication

Site Preparation and pipework fabrication

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Alastair Hunter

Used 5+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the phrase used for when plumbers start work and notch out and drill joist and put pipes under floors

Pre-plumbing

First fixing

Second fixing

Phase 1

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Which one of the following grades of copper is not suitable for bending?

R290

R300

R220

R250

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of these pipe fittings does not require a heat process (soldering) to join them to copper pipe

Media Image
Media Image
Media Image

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of these pipe fittings requires a hot works permit when jointing to copper pipe

Media Image
Media Image
Media Image
Media Image

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of pipe is used for underground water services

Media Image
Media Image
Media Image
Media Image

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When passing a pipe through a solid wall what should happen to the pipe

Wrap it in Denso tape

Sleeve it into another piece of the same pipe the next size up

Place some insulation over the pipe

Sleeve it into another piece of the same pipe two sizes up

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Why is it important to protect copper pipework with a protective sleeve in concrete floors and screeds

To avoid the pipes getting crushed

To retain heat

To prevent the pipes from corrosion

To make it easier to remove the pipes

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?