
Integrated Secondary Field Trip
Authored by Jirarat Jaturanon
Other
6th - 8th Grade
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
From the following list, which country has the highest electricity cost?
France
Germany
Brazil
Denmark
2.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Which building we all stay in The Greenery Resort Khao Yai ?
Tower A
Tower B
Tower C
Tower D
3.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
Khao Yai Thieng is a suitable area for the installation of wind turbines to generate electricity because?
this area has an average wind speed of 3-4 m/s
this area has an average wind speed of 4-5 m/s
this area has an average wind speed of 5-6 m/s
this area has an average wind speed of 6-7 m/s
4.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
How many students join this year Integrated Secondary Field Trip?
118
119
120
121
5.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
How much total electricity capacity do all the wind turbines at Khao Yai Thieng generate in megawatts?
24
25
26
27
6.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
How many teachers join this year Integrated Secondary Field Trip?
13
14
15
16
7.
MULTIPLE CHOICE QUESTION
30 sec • 5 pts
How many wind turbines are there at Khao Yai Thieng?
9
10
12
13
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?